Cargando…

BI MD studies on April 22nd 2012 (LHC MD-1)

During the LHC MD block 1 in 2012, eight hours were dedicated to beam instrumentation studies. Such a period was spent mainly for estimating the betatron functions at the location of the transverse profile monitors in IR4 via the K-Modulation method and for characterizing the BSRT extraction mirror...

Descripción completa

Detalles Bibliográficos
Autores principales: Baer, T, Bravin, E, Boccardi, A, Burger, S, Calvo, E, Dehning, B, Emery, J, Gasior, M, Guerrero, A, Jones, R, Lefevre, T, Gras, JJ, Rabiller, A, Roncarolo, F, Sapinski, M, Steinhagen, R, Trad, G
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1470555
_version_ 1780925361887903744
author Baer, T
Bravin, E
Boccardi, A
Burger, S
Calvo, E
Dehning, B
Emery, J
Gasior, M
Guerrero, A
Jones, R
Lefevre, T
Gras, JJ
Rabiller, A
Roncarolo, F
Sapinski, M
Steinhagen, R
Trad, G
author_facet Baer, T
Bravin, E
Boccardi, A
Burger, S
Calvo, E
Dehning, B
Emery, J
Gasior, M
Guerrero, A
Jones, R
Lefevre, T
Gras, JJ
Rabiller, A
Roncarolo, F
Sapinski, M
Steinhagen, R
Trad, G
author_sort Baer, T
collection CERN
description During the LHC MD block 1 in 2012, eight hours were dedicated to beam instrumentation studies. Such a period was spent mainly for estimating the betatron functions at the location of the transverse profile monitors in IR4 via the K-Modulation method and for characterizing the BSRT extraction mirror heating with high intensity beams. This note discusses the measurements summary, including some final and some preliminary results.
id cern-1470555
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14705552019-09-30T06:29:59Zhttp://cds.cern.ch/record/1470555engBaer, TBravin, EBoccardi, ABurger, SCalvo, EDehning, BEmery, JGasior, MGuerrero, AJones, RLefevre, TGras, JJRabiller, ARoncarolo, FSapinski, MSteinhagen, RTrad, GBI MD studies on April 22nd 2012 (LHC MD-1)Accelerators and Storage RingsDuring the LHC MD block 1 in 2012, eight hours were dedicated to beam instrumentation studies. Such a period was spent mainly for estimating the betatron functions at the location of the transverse profile monitors in IR4 via the K-Modulation method and for characterizing the BSRT extraction mirror heating with high intensity beams. This note discusses the measurements summary, including some final and some preliminary results.CERN-ATS-Note-2012-061 MDoai:cds.cern.ch:14705552012-07-18
spellingShingle Accelerators and Storage Rings
Baer, T
Bravin, E
Boccardi, A
Burger, S
Calvo, E
Dehning, B
Emery, J
Gasior, M
Guerrero, A
Jones, R
Lefevre, T
Gras, JJ
Rabiller, A
Roncarolo, F
Sapinski, M
Steinhagen, R
Trad, G
BI MD studies on April 22nd 2012 (LHC MD-1)
title BI MD studies on April 22nd 2012 (LHC MD-1)
title_full BI MD studies on April 22nd 2012 (LHC MD-1)
title_fullStr BI MD studies on April 22nd 2012 (LHC MD-1)
title_full_unstemmed BI MD studies on April 22nd 2012 (LHC MD-1)
title_short BI MD studies on April 22nd 2012 (LHC MD-1)
title_sort bi md studies on april 22nd 2012 (lhc md-1)
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1470555
work_keys_str_mv AT baert bimdstudiesonapril22nd2012lhcmd1
AT bravine bimdstudiesonapril22nd2012lhcmd1
AT boccardia bimdstudiesonapril22nd2012lhcmd1
AT burgers bimdstudiesonapril22nd2012lhcmd1
AT calvoe bimdstudiesonapril22nd2012lhcmd1
AT dehningb bimdstudiesonapril22nd2012lhcmd1
AT emeryj bimdstudiesonapril22nd2012lhcmd1
AT gasiorm bimdstudiesonapril22nd2012lhcmd1
AT guerreroa bimdstudiesonapril22nd2012lhcmd1
AT jonesr bimdstudiesonapril22nd2012lhcmd1
AT lefevret bimdstudiesonapril22nd2012lhcmd1
AT grasjj bimdstudiesonapril22nd2012lhcmd1
AT rabillera bimdstudiesonapril22nd2012lhcmd1
AT roncarolof bimdstudiesonapril22nd2012lhcmd1
AT sapinskim bimdstudiesonapril22nd2012lhcmd1
AT steinhagenr bimdstudiesonapril22nd2012lhcmd1
AT tradg bimdstudiesonapril22nd2012lhcmd1