LHC Beam Vacuum During 2011 Machine Operation
During the year 2011 the LHC operated for 682 fills, meaning 247 days and 2 hours of stable beam in total. From 368 bunches per beam at 150 ns bunch spacing circulating in the ring in December 2010, the 2011 proton physic ended with 1380 bunches per beam circulating with 50 ns bunch spacing. The mac...
Autores principales: | Lanza, G, Baglin, V, Bregliozzi, G, Jimenez, J M |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1470601 |
Ejemplares similares
-
CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum
por: Baglin, V, et al.
Publicado: (2014) -
LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
por: Bregliozzi, G, et al.
Publicado: (2014) -
Vacuum pressure observations during 2011 proton run
por: Bregliozzi, G, et al.
Publicado: (2012) -
Synchrotron Radiation in the LHC Vacuum System
por: Baglin, V, et al.
Publicado: (2011) -
LHC Beam Vacuum Evolution During 2015 Machine Operation
por: Yin Vallgren, Christina, et al.
Publicado: (2016)