Cargando…

Fabrication of the CERN/PSI/ST X-Band accelerating structures

In a collaboration between CERN, PSI and Sincrotrone Trieste (ST), a multi- purpose X-band accelerating structure has been designed and fabricated, used for high gradients tests in the CLIC structure testing program and in the FEL projects of PSI and ST. The structure has 72 cells with a phase advan...

Descripción completa

Detalles Bibliográficos
Autores principales: Dehler, Micha, Atieh, Said, Gudkov, Dmitry, Lebet, Serge, Riddone, Germana, Shi, Jiaru, Citterio, Alessandro, Zennaro, Riccardo, D'Auria, Gerardo, Serpico, Claudio
Lenguaje:eng
Publicado: 2011
Materias:
Acceso en línea:http://cds.cern.ch/record/1473437
Descripción
Sumario:In a collaboration between CERN, PSI and Sincrotrone Trieste (ST), a multi- purpose X-band accelerating structure has been designed and fabricated, used for high gradients tests in the CLIC structure testing program and in the FEL projects of PSI and ST. The structure has 72 cells with a phase advance of 5 pi/6 and includes upstream and down-stream wakefield monitors to measure the beam alignment. The SLAC mode launcher design is used to feed it with RF power. Following the CERN fabrication procedures for high-gradient structure, diffusion bonding and brazing in hydrogen atmosphere is used to assemble the cells. After tuning, a vacuum bakeout is required before the feedthroughs for the wake field monitors are welded in as a last step. We describe the experiences gained in finishing the first two structures out of a series of four and present the results from the RF tuning and low level RF tests.