Cargando…

The Upgrade of the ATLAS Level-1 Central Trigger Processor

The ATLAS Level-1 Central Trigger Processor (CTP) combines information from calorimeter and muon trigger processors as well as other sources and makes the final Level-1 Accept (L1A) decision. Due to the increasing luminosity of the LHC and the growing demands of physics and monitoring placed on the...

Descripción completa

Detalles Bibliográficos
Autores principales: ANDERS, G, BERGE, D, BERTELSEN, H, DAM, M, DOBSON, E, ELLIS, N, FARTHOUAT, P, GABALDON RUIZ, C, GHIBAUDI, M, GORINI, B, HAAS, S, KANEDA, Mi, MESSINA, A, PAULY, T, POTTGEN, R, SPIWOKS, R, WENGLER, T, MAETTIG, S, STOCKTON, M, XELLA, S
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1478415
_version_ 1780925600347717632
author ANDERS, G
BERGE, D
BERTELSEN, H
DAM, M
DOBSON, E
ELLIS, N
FARTHOUAT, P
GABALDON RUIZ, C
GHIBAUDI, M
GORINI, B
HAAS, S
KANEDA, Mi
MESSINA, A
PAULY, T
POTTGEN, R
SPIWOKS, R
WENGLER, T
MAETTIG, S
STOCKTON, M
XELLA, S
author_facet ANDERS, G
BERGE, D
BERTELSEN, H
DAM, M
DOBSON, E
ELLIS, N
FARTHOUAT, P
GABALDON RUIZ, C
GHIBAUDI, M
GORINI, B
HAAS, S
KANEDA, Mi
MESSINA, A
PAULY, T
POTTGEN, R
SPIWOKS, R
WENGLER, T
MAETTIG, S
STOCKTON, M
XELLA, S
author_sort ANDERS, G
collection CERN
description The ATLAS Level-1 Central Trigger Processor (CTP) combines information from calorimeter and muon trigger processors as well as other sources and makes the final Level-1 Accept (L1A) decision. Due to the increasing luminosity of the LHC and the growing demands of physics and monitoring placed on the ATLAS Level-1 trigger system, the current CTP has reached its design limits. Therefore and in order to provide some margin for future operation, the CTP will be upgraded during the LHC shutdown of 2013/14.
id cern-1478415
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14784152019-09-30T06:29:59Zhttp://cds.cern.ch/record/1478415engANDERS, GBERGE, DBERTELSEN, HDAM, MDOBSON, EELLIS, NFARTHOUAT, PGABALDON RUIZ, CGHIBAUDI, MGORINI, BHAAS, SKANEDA, MiMESSINA, APAULY, TPOTTGEN, RSPIWOKS, RWENGLER, TMAETTIG, SSTOCKTON, MXELLA, SThe Upgrade of the ATLAS Level-1 Central Trigger ProcessorDetectors and Experimental TechniquesThe ATLAS Level-1 Central Trigger Processor (CTP) combines information from calorimeter and muon trigger processors as well as other sources and makes the final Level-1 Accept (L1A) decision. Due to the increasing luminosity of the LHC and the growing demands of physics and monitoring placed on the ATLAS Level-1 trigger system, the current CTP has reached its design limits. Therefore and in order to provide some margin for future operation, the CTP will be upgraded during the LHC shutdown of 2013/14.ATL-DAQ-SLIDE-2012-530oai:cds.cern.ch:14784152012-09-17
spellingShingle Detectors and Experimental Techniques
ANDERS, G
BERGE, D
BERTELSEN, H
DAM, M
DOBSON, E
ELLIS, N
FARTHOUAT, P
GABALDON RUIZ, C
GHIBAUDI, M
GORINI, B
HAAS, S
KANEDA, Mi
MESSINA, A
PAULY, T
POTTGEN, R
SPIWOKS, R
WENGLER, T
MAETTIG, S
STOCKTON, M
XELLA, S
The Upgrade of the ATLAS Level-1 Central Trigger Processor
title The Upgrade of the ATLAS Level-1 Central Trigger Processor
title_full The Upgrade of the ATLAS Level-1 Central Trigger Processor
title_fullStr The Upgrade of the ATLAS Level-1 Central Trigger Processor
title_full_unstemmed The Upgrade of the ATLAS Level-1 Central Trigger Processor
title_short The Upgrade of the ATLAS Level-1 Central Trigger Processor
title_sort upgrade of the atlas level-1 central trigger processor
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/1478415
work_keys_str_mv AT andersg theupgradeoftheatlaslevel1centraltriggerprocessor
AT berged theupgradeoftheatlaslevel1centraltriggerprocessor
AT bertelsenh theupgradeoftheatlaslevel1centraltriggerprocessor
AT damm theupgradeoftheatlaslevel1centraltriggerprocessor
AT dobsone theupgradeoftheatlaslevel1centraltriggerprocessor
AT ellisn theupgradeoftheatlaslevel1centraltriggerprocessor
AT farthouatp theupgradeoftheatlaslevel1centraltriggerprocessor
AT gabaldonruizc theupgradeoftheatlaslevel1centraltriggerprocessor
AT ghibaudim theupgradeoftheatlaslevel1centraltriggerprocessor
AT gorinib theupgradeoftheatlaslevel1centraltriggerprocessor
AT haass theupgradeoftheatlaslevel1centraltriggerprocessor
AT kanedami theupgradeoftheatlaslevel1centraltriggerprocessor
AT messinaa theupgradeoftheatlaslevel1centraltriggerprocessor
AT paulyt theupgradeoftheatlaslevel1centraltriggerprocessor
AT pottgenr theupgradeoftheatlaslevel1centraltriggerprocessor
AT spiwoksr theupgradeoftheatlaslevel1centraltriggerprocessor
AT wenglert theupgradeoftheatlaslevel1centraltriggerprocessor
AT maettigs theupgradeoftheatlaslevel1centraltriggerprocessor
AT stocktonm theupgradeoftheatlaslevel1centraltriggerprocessor
AT xellas theupgradeoftheatlaslevel1centraltriggerprocessor
AT andersg upgradeoftheatlaslevel1centraltriggerprocessor
AT berged upgradeoftheatlaslevel1centraltriggerprocessor
AT bertelsenh upgradeoftheatlaslevel1centraltriggerprocessor
AT damm upgradeoftheatlaslevel1centraltriggerprocessor
AT dobsone upgradeoftheatlaslevel1centraltriggerprocessor
AT ellisn upgradeoftheatlaslevel1centraltriggerprocessor
AT farthouatp upgradeoftheatlaslevel1centraltriggerprocessor
AT gabaldonruizc upgradeoftheatlaslevel1centraltriggerprocessor
AT ghibaudim upgradeoftheatlaslevel1centraltriggerprocessor
AT gorinib upgradeoftheatlaslevel1centraltriggerprocessor
AT haass upgradeoftheatlaslevel1centraltriggerprocessor
AT kanedami upgradeoftheatlaslevel1centraltriggerprocessor
AT messinaa upgradeoftheatlaslevel1centraltriggerprocessor
AT paulyt upgradeoftheatlaslevel1centraltriggerprocessor
AT pottgenr upgradeoftheatlaslevel1centraltriggerprocessor
AT spiwoksr upgradeoftheatlaslevel1centraltriggerprocessor
AT wenglert upgradeoftheatlaslevel1centraltriggerprocessor
AT maettigs upgradeoftheatlaslevel1centraltriggerprocessor
AT stocktonm upgradeoftheatlaslevel1centraltriggerprocessor
AT xellas upgradeoftheatlaslevel1centraltriggerprocessor