Cargando…
Reliability and Intervention Management for the LHC
Since 2010, CERN has entered a mode of continuous operation of the LHC and its injectors, which implies the continuous operation of all the infrastructure and support systems. High reliability of the machines is crucial to meet the physics goals. This high reliability must be accompanied by a fast r...
Autores principales: | Foraz, K, De Jonghe, J, Richard Cook, J, Coupard, J, Daudin, B, Baltasar Dos Santos Pedrosa, F, Reguero Fuentes, E, Garino, C, Golikov, K, Grillot, S, Richard Jaekel, M, Sollander, P |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1481521 |
Ejemplares similares
-
Intervention Management from Operation to Shutdown
por: Garino, Cedric, et al.
Publicado: (2013) -
First LHC Shutdown: Coordination and Schedule Issues
por: Coupard, J, et al.
Publicado: (2010) -
LHC Long Shutdown: A Parenthesis for a Challenge
por: Foraz, K, et al.
Publicado: (2013) -
The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group
por: Perrot, Anne-Laure, et al.
Publicado: (2022) -
Where are we with the current shutdown?
por: Coupard, J, et al.
Publicado: (2009)