Cargando…
A Clamped Be Window for the Dump of the HiRadMat Experiment at CERN
At CERN, the High Radiation to Materials facility (HiRadMat) is designed to test accelerator components under the impact of high-intensity pulsed beams and will start operation in 2012. In this frame an LHC TED-type dump was installed at the end of the line, working in nitrogen over-pressure, and a...
Autores principales: | Delonca, M, Antonakakis, T, Grenier, D, Maglioni, C, Sarrio Martinez, A |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1481531 |
Ejemplares similares
-
A Clamped Be Window for the Dump of the HiRadMat Experiment at CERN
por: Delonca, M, et al.
Publicado: (2012) -
An Experiment at HiRadMat: Irradiation of high-Z Materials
por: Blanco Sancho, J, et al.
Publicado: (2011) -
Targetry Challenges & HiRadMat
por: Harden, Fiona, et al.
Publicado: (2021) -
HiRadMat: A New Irradiation Facility for Material Testing at CERN
por: Efthymiopoulos, I, et al.
Publicado: (2011) -
First Year of Operations in the HiRadMat Irradiation Facility at CERN
por: Fabich, A, et al.
Publicado: (2013)