Cargando…

Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN

In the frame of the LHC Injectors Upgrade Project at CERN (LIU), the new 160MeV H- Linac4 will inject into the four existing PS Booster rings after the conversion of H- into H+ in a stripping foil. Given a limited stripping efficiency and possible foil failures, a certain percentage of the beam is f...

Descripción completa

Detalles Bibliográficos
Autores principales: Delonca, M, Maglioni, C, Patapenka, A, Sarrio Martinez, A
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1481550
_version_ 1780925960296595456
author Delonca, M
Maglioni, C
Patapenka, A
Sarrio Martinez, A
author_facet Delonca, M
Maglioni, C
Patapenka, A
Sarrio Martinez, A
author_sort Delonca, M
collection CERN
description In the frame of the LHC Injectors Upgrade Project at CERN (LIU), the new 160MeV H- Linac4 will inject into the four existing PS Booster rings after the conversion of H- into H+ in a stripping foil. Given a limited stripping efficiency and possible foil failures, a certain percentage of the beam is foreseen to remain partially (H0) or completely (H-) unstripped. An internal dump installed into the chicane magnet to stop these unstripped beams is therefore required. This paper presents the conceptual design of the internal dump, reviewing loading assumptions, design constraints, limitations and integration studies. Power evacuation through the thermal contact between the core and the external active cooling is addressed and, finally, results from the numerical thermo-mechanical analyses are reported.
id cern-1481550
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14815502022-08-17T13:32:19Zhttp://cds.cern.ch/record/1481550engDelonca, MMaglioni, CPatapenka, ASarrio Martinez, AInternal H0/H- Dump for the Proton Synchrotron Booster Injection at CERNAccelerators and Storage RingsIn the frame of the LHC Injectors Upgrade Project at CERN (LIU), the new 160MeV H- Linac4 will inject into the four existing PS Booster rings after the conversion of H- into H+ in a stripping foil. Given a limited stripping efficiency and possible foil failures, a certain percentage of the beam is foreseen to remain partially (H0) or completely (H-) unstripped. An internal dump installed into the chicane magnet to stop these unstripped beams is therefore required. This paper presents the conceptual design of the internal dump, reviewing loading assumptions, design constraints, limitations and integration studies. Power evacuation through the thermal contact between the core and the external active cooling is addressed and, finally, results from the numerical thermo-mechanical analyses are reported.CERN-ATS-2012-263oai:cds.cern.ch:14815502012-05-16
spellingShingle Accelerators and Storage Rings
Delonca, M
Maglioni, C
Patapenka, A
Sarrio Martinez, A
Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN
title Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN
title_full Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN
title_fullStr Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN
title_full_unstemmed Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN
title_short Internal H0/H- Dump for the Proton Synchrotron Booster Injection at CERN
title_sort internal h0/h- dump for the proton synchrotron booster injection at cern
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1481550
work_keys_str_mv AT deloncam internalh0hdumpfortheprotonsynchrotronboosterinjectionatcern
AT maglionic internalh0hdumpfortheprotonsynchrotronboosterinjectionatcern
AT patapenkaa internalh0hdumpfortheprotonsynchrotronboosterinjectionatcern
AT sarriomartineza internalh0hdumpfortheprotonsynchrotronboosterinjectionatcern