Cargando…
Validation of the CLIC alignment strategy on short range
The pre-alignment of CLIC consists of aligning the components of linacs and beam delivery systems (BDS) in the most accurate possible way, so that a first pilot beam can circulate and allow the implementation of the beam based alignment. Taking into account the precision and accuracy needed: 10 µm r...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1483223 |
_version_ | 1780926020911628288 |
---|---|
author | Mainaud Durand, H Anastasopoulos, M Griffet, S Kemppinen, J Rude, V Sosin, M |
author_facet | Mainaud Durand, H Anastasopoulos, M Griffet, S Kemppinen, J Rude, V Sosin, M |
author_sort | Mainaud Durand, H |
collection | CERN |
description | The pre-alignment of CLIC consists of aligning the components of linacs and beam delivery systems (BDS) in the most accurate possible way, so that a first pilot beam can circulate and allow the implementation of the beam based alignment. Taking into account the precision and accuracy needed: 10 µm rms over sliding windows of 200m, this pre-alignment must be active and it can be divided into two parts: the determination of a straight reference over 20 km, thanks to a metrological network and the determination of the component positions with respect to this reference, and their adjustment. The second part is the object of the paper, describing the steps of the proposed strategy: firstly the fiducialisation of the different components of CLIC; secondly, the alignment of these components on common supports and thirdly the active alignment of these supports using sensors and actuators. These steps have been validated on a test setup over a length of 4m, and the obtained results are analysed. |
id | cern-1483223 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-14832232019-09-30T06:29:59Zhttp://cds.cern.ch/record/1483223engMainaud Durand, HAnastasopoulos, MGriffet, SKemppinen, JRude, VSosin, MValidation of the CLIC alignment strategy on short rangeAccelerators and Storage RingsThe pre-alignment of CLIC consists of aligning the components of linacs and beam delivery systems (BDS) in the most accurate possible way, so that a first pilot beam can circulate and allow the implementation of the beam based alignment. Taking into account the precision and accuracy needed: 10 µm rms over sliding windows of 200m, this pre-alignment must be active and it can be divided into two parts: the determination of a straight reference over 20 km, thanks to a metrological network and the determination of the component positions with respect to this reference, and their adjustment. The second part is the object of the paper, describing the steps of the proposed strategy: firstly the fiducialisation of the different components of CLIC; secondly, the alignment of these components on common supports and thirdly the active alignment of these supports using sensors and actuators. These steps have been validated on a test setup over a length of 4m, and the obtained results are analysed.CERN-ATS-2012-272oai:cds.cern.ch:14832232012-09-10 |
spellingShingle | Accelerators and Storage Rings Mainaud Durand, H Anastasopoulos, M Griffet, S Kemppinen, J Rude, V Sosin, M Validation of the CLIC alignment strategy on short range |
title | Validation of the CLIC alignment strategy on short range |
title_full | Validation of the CLIC alignment strategy on short range |
title_fullStr | Validation of the CLIC alignment strategy on short range |
title_full_unstemmed | Validation of the CLIC alignment strategy on short range |
title_short | Validation of the CLIC alignment strategy on short range |
title_sort | validation of the clic alignment strategy on short range |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1483223 |
work_keys_str_mv | AT mainauddurandh validationoftheclicalignmentstrategyonshortrange AT anastasopoulosm validationoftheclicalignmentstrategyonshortrange AT griffets validationoftheclicalignmentstrategyonshortrange AT kemppinenj validationoftheclicalignmentstrategyonshortrange AT rudev validationoftheclicalignmentstrategyonshortrange AT sosinm validationoftheclicalignmentstrategyonshortrange |