Cargando…
The HIE-ISOLDE alignment and monitoring system software and test mock up
For the HIE Isolde project a superconducting linac will be built at CERN in the Isolde facility area. The linac will be based on the creation and installation of 2 high- β and 4 low- β cryomodules containing respectively 5 high-β superconducting cavities and 1 superconducting solenoid for the two fi...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1483227 |