Cargando…
Emittance reconstruction technique for the Linac4 high energy commissioning
Linac4 is a new 160 MeV linear accelerator for negative Hydrogen ions (H-) presently under construction which will replace the 50 MeV proton Linac2 as injector for the CERN proton accelerator complex. Linac4 is 80 meters long and comprises a Low Energy Beam Transport line, a 3 MeV RFQ, a MEBT, a 50...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1483706 |
Sumario: | Linac4 is a new 160 MeV linear accelerator for negative Hydrogen ions (H-) presently under construction which will replace the 50 MeV proton Linac2 as injector for the CERN proton accelerator complex. Linac4 is 80 meters long and comprises a Low Energy Beam Transport line, a 3 MeV RFQ, a MEBT, a 50 MeV DTL, a 100 MeV CCDTL and a PIMS up to 160 MeV. The commissioning of the Linac is scheduled to start in 2013. It will be divided into several steps corresponding to the commissioning of the different accelerating structures. A temporary measurement bench will be dedicated to the high energy commissioning from 30 to 100 MeV (DTL tanks 2 and 3, and CCDTL). The commissioning of the PIMS will be done using the permanent equipment installed in between the end of the Linac and the main dump. This note describes the technique we will use for reconstructing the transverse emittances and the expected results. |
---|