Summary of the LIU Beam Studies Review

A review of the status of the LHC injector beam studies related to the LHC Injectors Upgrade (LIU) project took place on the 28 August 2012 at CERN. The main goal of the review was to define work priorities for the rest of the run before the Long Shutdown 1 (LS1) and be able to: • specify the equipm...

Descripción completa

Detalles Bibliográficos
Autores principales: Rumolo, G, Aumon, S, Bartmann, W, Bartosik, H, Huschauer, A, Raginel, V, Timko, H
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1489669
_version_ 1780926345414443008
author Rumolo, G
Aumon, S
Bartmann, W
Bartosik, H
Huschauer, A
Raginel, V
Timko, H
author_facet Rumolo, G
Aumon, S
Bartmann, W
Bartosik, H
Huschauer, A
Raginel, V
Timko, H
author_sort Rumolo, G
collection CERN
description A review of the status of the LHC injector beam studies related to the LHC Injectors Upgrade (LIU) project took place on the 28 August 2012 at CERN. The main goal of the review was to define work priorities for the rest of the run before the Long Shutdown 1 (LS1) and be able to: • specify the equipment to be built for the LIU project; • estimate achievable beam characteristics in the various accelerators. A team of external reviewers was also asked to participate in the event and comment on the status of the presently ongoing activities as well as give recommendations for future work.
id cern-1489669
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14896692019-09-30T06:29:59Zhttp://cds.cern.ch/record/1489669engRumolo, GAumon, SBartmann, WBartosik, HHuschauer, ARaginel, VTimko, HSummary of the LIU Beam Studies ReviewAccelerators and Storage RingsA review of the status of the LHC injector beam studies related to the LHC Injectors Upgrade (LIU) project took place on the 28 August 2012 at CERN. The main goal of the review was to define work priorities for the rest of the run before the Long Shutdown 1 (LS1) and be able to: • specify the equipment to be built for the LIU project; • estimate achievable beam characteristics in the various accelerators. A team of external reviewers was also asked to participate in the event and comment on the status of the presently ongoing activities as well as give recommendations for future work.CERN-ATS-Note-2012-083 PERFoai:cds.cern.ch:14896692012-10-20
spellingShingle Accelerators and Storage Rings
Rumolo, G
Aumon, S
Bartmann, W
Bartosik, H
Huschauer, A
Raginel, V
Timko, H
Summary of the LIU Beam Studies Review
title Summary of the LIU Beam Studies Review
title_full Summary of the LIU Beam Studies Review
title_fullStr Summary of the LIU Beam Studies Review
title_full_unstemmed Summary of the LIU Beam Studies Review
title_short Summary of the LIU Beam Studies Review
title_sort summary of the liu beam studies review
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1489669
work_keys_str_mv AT rumolog summaryoftheliubeamstudiesreview
AT aumons summaryoftheliubeamstudiesreview
AT bartmannw summaryoftheliubeamstudiesreview
AT bartosikh summaryoftheliubeamstudiesreview
AT huschauera summaryoftheliubeamstudiesreview
AT raginelv summaryoftheliubeamstudiesreview
AT timkoh summaryoftheliubeamstudiesreview