Cargando…
Input from Evian 2011
The LHC Beam Operation workshop 2011 took place 12th - 14th December. The principle aims of the workshop were to review 2011 LHC beam commissioning and beam operations experience, and to look forward to the operation of the LHC in 2012. Issues covered include: availability; injection; operational pe...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.54 http://cds.cern.ch/record/1492214 |
Sumario: | The LHC Beam Operation workshop 2011 took place 12th - 14th December. The principle aims of the workshop were to review 2011 LHC beam commissioning and beam operations experience, and to look forward to the operation of the LHC in 2012. Issues covered include: availability; injection; operational performance; beam loss and machine protection;system performance; limitations; and the outlook for 2012. A concise summary of the workshop is presented and potential performance issues for 2012 are highlighted. Where material is covered in more depth here at Chamonix appropriate reference will be made. |
---|