Cargando…
Injection and lessons for 2012
Injection of 144 bunches into the LHC became fully operational during the 2011 run and a nominal injection of 288 bunches was accomplished during MD time. Several mitigation solutions were put in place to minimise losses from the transfer line (TL) collimators and losses from kicking debunched beam...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.65 http://cds.cern.ch/record/1492573 |
Sumario: | Injection of 144 bunches into the LHC became fully operational during the 2011 run and a nominal injection of 288 bunches was accomplished during MD time. Several mitigation solutions were put in place to minimise losses from the transfer line (TL) collimators and losses from kicking debunched beam during injection. Nevertheless, shot-by-shot and bunch-by-bunch trajectory variations, as well as long terms drifts, were observed and required a regular resteering of the TL implying a non negligible amount of time spent for injection setup. Likely sources of instability have been identified (i.e. MKE and MSE ripples) and possible cures to optimise 2012 operation are presented. Well defined references for TL steering will be defined in a more rigorous way in order to allow a more straightforward and faster injection setup. Encountered and potential issues of the injection system, in particular the injection kickers MKI, are discussed also in view of injections with a higher number of bunches. |
---|