Cargando…

Vacuum performance and lessons for 2012

During the LHC run 2011, a tremendous progress has been made towards the machine operation with design parameters. In the same time, the run confirmed the sensitivity of the beam vacuum system to the machine parameters. As expected, a successful scrubbing period allowed mitigating the effects of the...

Descripción completa

Detalles Bibliográficos
Autores principales: Baglin, V, Bregliozzi, G, Jimenez, J M, Lanza, G
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.74
http://cds.cern.ch/record/1492579
_version_ 1780926459142995968
author Baglin, V
Bregliozzi, G
Jimenez, J M
Lanza, G
author_facet Baglin, V
Bregliozzi, G
Jimenez, J M
Lanza, G
author_sort Baglin, V
collection CERN
description During the LHC run 2011, a tremendous progress has been made towards the machine operation with design parameters. In the same time, the run confirmed the sensitivity of the beam vacuum system to the machine parameters. As expected, a successful scrubbing period allowed mitigating the effects of the electron cloud giving room to an entire filling of the ring with 50 ns beams. In parallel issues such as the impact of the beam screen regulation, pressures spikes and local outgassing were observed during the year. On-line mitigations and immediate compensatory measures implemented during the winter technical stop are reviewed together with their efficiencies. The expected limitations while waiting for LS1 consolidation or when running with 25 ns beams are addressed. Lessons for 2012 are discussed.
id cern-1492579
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling cern-14925792022-08-10T20:40:40Zdoi:10.5170/CERN-2012-006.74http://cds.cern.ch/record/1492579engBaglin, VBregliozzi, GJimenez, J MLanza, GVacuum performance and lessons for 2012Accelerators and Storage RingsDuring the LHC run 2011, a tremendous progress has been made towards the machine operation with design parameters. In the same time, the run confirmed the sensitivity of the beam vacuum system to the machine parameters. As expected, a successful scrubbing period allowed mitigating the effects of the electron cloud giving room to an entire filling of the ring with 50 ns beams. In parallel issues such as the impact of the beam screen regulation, pressures spikes and local outgassing were observed during the year. On-line mitigations and immediate compensatory measures implemented during the winter technical stop are reviewed together with their efficiencies. The expected limitations while waiting for LS1 consolidation or when running with 25 ns beams are addressed. Lessons for 2012 are discussed.CERNoai:cds.cern.ch:14925792012
spellingShingle Accelerators and Storage Rings
Baglin, V
Bregliozzi, G
Jimenez, J M
Lanza, G
Vacuum performance and lessons for 2012
title Vacuum performance and lessons for 2012
title_full Vacuum performance and lessons for 2012
title_fullStr Vacuum performance and lessons for 2012
title_full_unstemmed Vacuum performance and lessons for 2012
title_short Vacuum performance and lessons for 2012
title_sort vacuum performance and lessons for 2012
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2012-006.74
http://cds.cern.ch/record/1492579
work_keys_str_mv AT baglinv vacuumperformanceandlessonsfor2012
AT bregliozzig vacuumperformanceandlessonsfor2012
AT jimenezjm vacuumperformanceandlessonsfor2012
AT lanzag vacuumperformanceandlessonsfor2012