Cargando…
LHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns)
LHC operation in 2011 had a smooth start in March with 75ns beams and only one month later moved to 50ns beam, after a successful dedicated scrubbing run. Several observables, such as pressure rise, heat load in the arcs, beam instability, emittance growth and synchronous phase shift, clearly pointe...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.89 http://cds.cern.ch/record/1492581 |
_version_ | 1780926459571863552 |
---|---|
author | Rumolo, G Iadarola, G Domìnguez, O Arduini, G Bartosik, H Claudet, S Esteban-Müller, J Roncarolo, F Shaposhnikova, E Tavian, L |
author_facet | Rumolo, G Iadarola, G Domìnguez, O Arduini, G Bartosik, H Claudet, S Esteban-Müller, J Roncarolo, F Shaposhnikova, E Tavian, L |
author_sort | Rumolo, G |
collection | CERN |
description | LHC operation in 2011 had a smooth start in March with 75ns beams and only one month later moved to 50ns beam, after a successful dedicated scrubbing run. Several observables, such as pressure rise, heat load in the arcs, beam instability, emittance growth and synchronous phase shift, clearly pointed to the presence of an electron cloud inside the machine during the first days of operation with 50ns beams. The gradual reduction of all these effects, and their eventual disappearance, over the days of the scrubbing run, indicated electron cloud mitigation and allowed physics production to shift to 50ns beams. Up to the end of the run the quality of the 50ns beams was increased by regular stages (first lower transverse emittances, then higher intensities) and they could provide steadily improving peak luminosities. Furthermore, five MD sessions with 25ns beams took place in the period June-October, but the quality of these beams was always deteriorated by severe electron cloud effects. However, a clear improvement was noticed also with the 25ns runs. An estimation of the present state of conditioning of the machine and the required scrubbing time can be inferred from electron cloud simulations compared with measured data. |
id | cern-1492581 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | cern-14925812022-08-10T20:40:40Zdoi:10.5170/CERN-2012-006.89http://cds.cern.ch/record/1492581engRumolo, GIadarola, GDomìnguez, OArduini, GBartosik, HClaudet, SEsteban-Müller, JRoncarolo, FShaposhnikova, ETavian, LLHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns)Accelerators and Storage RingsLHC operation in 2011 had a smooth start in March with 75ns beams and only one month later moved to 50ns beam, after a successful dedicated scrubbing run. Several observables, such as pressure rise, heat load in the arcs, beam instability, emittance growth and synchronous phase shift, clearly pointed to the presence of an electron cloud inside the machine during the first days of operation with 50ns beams. The gradual reduction of all these effects, and their eventual disappearance, over the days of the scrubbing run, indicated electron cloud mitigation and allowed physics production to shift to 50ns beams. Up to the end of the run the quality of the 50ns beams was increased by regular stages (first lower transverse emittances, then higher intensities) and they could provide steadily improving peak luminosities. Furthermore, five MD sessions with 25ns beams took place in the period June-October, but the quality of these beams was always deteriorated by severe electron cloud effects. However, a clear improvement was noticed also with the 25ns runs. An estimation of the present state of conditioning of the machine and the required scrubbing time can be inferred from electron cloud simulations compared with measured data.CERNoai:cds.cern.ch:14925812012 |
spellingShingle | Accelerators and Storage Rings Rumolo, G Iadarola, G Domìnguez, O Arduini, G Bartosik, H Claudet, S Esteban-Müller, J Roncarolo, F Shaposhnikova, E Tavian, L LHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns) |
title | LHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns) |
title_full | LHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns) |
title_fullStr | LHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns) |
title_full_unstemmed | LHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns) |
title_short | LHC experience with different bunch spacings in 2011 (25 , 50 & 75 ns) |
title_sort | lhc experience with different bunch spacings in 2011 (25 , 50 & 75 ns) |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2012-006.89 http://cds.cern.ch/record/1492581 |
work_keys_str_mv | AT rumolog lhcexperiencewithdifferentbunchspacingsin2011255075ns AT iadarolag lhcexperiencewithdifferentbunchspacingsin2011255075ns AT dominguezo lhcexperiencewithdifferentbunchspacingsin2011255075ns AT arduinig lhcexperiencewithdifferentbunchspacingsin2011255075ns AT bartosikh lhcexperiencewithdifferentbunchspacingsin2011255075ns AT claudets lhcexperiencewithdifferentbunchspacingsin2011255075ns AT estebanmullerj lhcexperiencewithdifferentbunchspacingsin2011255075ns AT roncarolof lhcexperiencewithdifferentbunchspacingsin2011255075ns AT shaposhnikovae lhcexperiencewithdifferentbunchspacingsin2011255075ns AT tavianl lhcexperiencewithdifferentbunchspacingsin2011255075ns |