Cargando…
Turn-around improvements
An efficient turn-around will be an important parameter for the integrated luminosity performance at LHC in 2012, when an operation with steady beam parameters will be achieved at the of the run. Improvements of the operational cycle were already put successfully in place after the 2010 experience b...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.139 http://cds.cern.ch/record/1492953 |
_version_ | 1780926466569011200 |
---|---|
author | Redaelli, Stefano Venturini Delsolaro, Walter |
author_facet | Redaelli, Stefano Venturini Delsolaro, Walter |
author_sort | Redaelli, Stefano |
collection | CERN |
description | An efficient turn-around will be an important parameter for the integrated luminosity performance at LHC in 2012, when an operation with steady beam parameters will be achieved at the of the run. Improvements of the operational cycle were already put successfully in place after the 2010 experience but additional ways to reduce the time required to setup collisions are possible. In this paper, the 2011 turn-around performance is reviewed and the benefits of the improvements from 2010 are presented. Phases of the operational cycle when further amelioration is possible are discussed and some proposals for a faster turn-around in 2012 are outlined. |
id | cern-1492953 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | cern-14929532022-08-10T20:28:26Zdoi:10.5170/CERN-2012-006.139http://cds.cern.ch/record/1492953engRedaelli, StefanoVenturini Delsolaro, WalterTurn-around improvementsAccelerators and Storage RingsAn efficient turn-around will be an important parameter for the integrated luminosity performance at LHC in 2012, when an operation with steady beam parameters will be achieved at the of the run. Improvements of the operational cycle were already put successfully in place after the 2010 experience but additional ways to reduce the time required to setup collisions are possible. In this paper, the 2011 turn-around performance is reviewed and the benefits of the improvements from 2010 are presented. Phases of the operational cycle when further amelioration is possible are discussed and some proposals for a faster turn-around in 2012 are outlined.CERNoai:cds.cern.ch:14929532012 |
spellingShingle | Accelerators and Storage Rings Redaelli, Stefano Venturini Delsolaro, Walter Turn-around improvements |
title | Turn-around improvements |
title_full | Turn-around improvements |
title_fullStr | Turn-around improvements |
title_full_unstemmed | Turn-around improvements |
title_short | Turn-around improvements |
title_sort | turn-around improvements |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2012-006.139 http://cds.cern.ch/record/1492953 |
work_keys_str_mv | AT redaellistefano turnaroundimprovements AT venturinidelsolarowalter turnaroundimprovements |