Turn-around improvements

An efficient turn-around will be an important parameter for the integrated luminosity performance at LHC in 2012, when an operation with steady beam parameters will be achieved at the of the run. Improvements of the operational cycle were already put successfully in place after the 2010 experience b...

Descripción completa

Detalles Bibliográficos
Autores principales: Redaelli, Stefano, Venturini Delsolaro, Walter
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.139
http://cds.cern.ch/record/1492953
_version_ 1780926466569011200
author Redaelli, Stefano
Venturini Delsolaro, Walter
author_facet Redaelli, Stefano
Venturini Delsolaro, Walter
author_sort Redaelli, Stefano
collection CERN
description An efficient turn-around will be an important parameter for the integrated luminosity performance at LHC in 2012, when an operation with steady beam parameters will be achieved at the of the run. Improvements of the operational cycle were already put successfully in place after the 2010 experience but additional ways to reduce the time required to setup collisions are possible. In this paper, the 2011 turn-around performance is reviewed and the benefits of the improvements from 2010 are presented. Phases of the operational cycle when further amelioration is possible are discussed and some proposals for a faster turn-around in 2012 are outlined.
id cern-1492953
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling cern-14929532022-08-10T20:28:26Zdoi:10.5170/CERN-2012-006.139http://cds.cern.ch/record/1492953engRedaelli, StefanoVenturini Delsolaro, WalterTurn-around improvementsAccelerators and Storage RingsAn efficient turn-around will be an important parameter for the integrated luminosity performance at LHC in 2012, when an operation with steady beam parameters will be achieved at the of the run. Improvements of the operational cycle were already put successfully in place after the 2010 experience but additional ways to reduce the time required to setup collisions are possible. In this paper, the 2011 turn-around performance is reviewed and the benefits of the improvements from 2010 are presented. Phases of the operational cycle when further amelioration is possible are discussed and some proposals for a faster turn-around in 2012 are outlined.CERNoai:cds.cern.ch:14929532012
spellingShingle Accelerators and Storage Rings
Redaelli, Stefano
Venturini Delsolaro, Walter
Turn-around improvements
title Turn-around improvements
title_full Turn-around improvements
title_fullStr Turn-around improvements
title_full_unstemmed Turn-around improvements
title_short Turn-around improvements
title_sort turn-around improvements
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2012-006.139
http://cds.cern.ch/record/1492953
work_keys_str_mv AT redaellistefano turnaroundimprovements
AT venturinidelsolarowalter turnaroundimprovements