Cargando…

MD plans in 2012

Machine development sessions were performed in 2011 during dedicated slots of beam time. These MD studies were scheduled and planned in detail well before, reflecting the agreed priorities: further optimizing machine performance, exploring beam parameters beyond design targets, assessing machine lim...

Descripción completa

Detalles Bibliográficos
Autor principal: Assmann, R
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1492970
_version_ 1780926469372903424
author Assmann, R
author_facet Assmann, R
author_sort Assmann, R
collection CERN
description Machine development sessions were performed in 2011 during dedicated slots of beam time. These MD studies were scheduled and planned in detail well before, reflecting the agreed priorities: further optimizing machine performance, exploring beam parameters beyond design targets, assessing machine limitations, testing new concepts and machine settings. The MD's in 2012 will build on the successful 2011 experience. The proposed priorities are discussed. A particular emphasis is put on how to best prepare future LHC running in view of the upcoming LHC shutdown in 2013/14 and the recommissioning of the LHC with double beam energy and nominal luminosity by 2014/15.
id cern-1492970
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-14929702019-09-30T06:29:59Zhttp://cds.cern.ch/record/1492970engAssmann, RMD plans in 2012Accelerators and Storage RingsMachine development sessions were performed in 2011 during dedicated slots of beam time. These MD studies were scheduled and planned in detail well before, reflecting the agreed priorities: further optimizing machine performance, exploring beam parameters beyond design targets, assessing machine limitations, testing new concepts and machine settings. The MD's in 2012 will build on the successful 2011 experience. The proposed priorities are discussed. A particular emphasis is put on how to best prepare future LHC running in view of the upcoming LHC shutdown in 2013/14 and the recommissioning of the LHC with double beam energy and nominal luminosity by 2014/15.oai:cds.cern.ch:14929702012
spellingShingle Accelerators and Storage Rings
Assmann, R
MD plans in 2012
title MD plans in 2012
title_full MD plans in 2012
title_fullStr MD plans in 2012
title_full_unstemmed MD plans in 2012
title_short MD plans in 2012
title_sort md plans in 2012
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1492970
work_keys_str_mv AT assmannr mdplansin2012