R2E strategy and activities during LS1

The level of flux of hadrons with energy in the multi MeV range expected from the collimation system at Point 7 and from the collisions at the interaction Points 1, 5 and 8 will induce Single Event Errors (SEE) of the standard electronics present in equipment located around these Points. Such events...

Descripción completa

Detalles Bibliográficos
Autor principal: Perrot, A
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.225
http://cds.cern.ch/record/1492977
_version_ 1780926470673137664
author Perrot, A
author_facet Perrot, A
author_sort Perrot, A
collection CERN
description The level of flux of hadrons with energy in the multi MeV range expected from the collimation system at Point 7 and from the collisions at the interaction Points 1, 5 and 8 will induce Single Event Errors (SEE) of the standard electronics present in equipment located around these Points. Such events would perturb the LHC operation. As a consequence, within the framework of the R2E (Radiation to Electronics) Mitigation project, the sensitive equipment will be shielded or relocated in safer areas. These mitigations activities will be performed mainly during Long Shutdown 1 (LS1). About 15 groups (including equipment owners) will be involved in these activities with work periods from a few days to several months. Some of them will have to work in parallel in several LHC Points. This document presents these mitigations activities with their associated planning, organization process, and main concerns as identified today.
id cern-1492977
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling cern-14929772022-08-10T20:41:28Zdoi:10.5170/CERN-2012-006.225http://cds.cern.ch/record/1492977engPerrot, AR2E strategy and activities during LS1Accelerators and Storage RingsThe level of flux of hadrons with energy in the multi MeV range expected from the collimation system at Point 7 and from the collisions at the interaction Points 1, 5 and 8 will induce Single Event Errors (SEE) of the standard electronics present in equipment located around these Points. Such events would perturb the LHC operation. As a consequence, within the framework of the R2E (Radiation to Electronics) Mitigation project, the sensitive equipment will be shielded or relocated in safer areas. These mitigations activities will be performed mainly during Long Shutdown 1 (LS1). About 15 groups (including equipment owners) will be involved in these activities with work periods from a few days to several months. Some of them will have to work in parallel in several LHC Points. This document presents these mitigations activities with their associated planning, organization process, and main concerns as identified today.CERNoai:cds.cern.ch:14929772012
spellingShingle Accelerators and Storage Rings
Perrot, A
R2E strategy and activities during LS1
title R2E strategy and activities during LS1
title_full R2E strategy and activities during LS1
title_fullStr R2E strategy and activities during LS1
title_full_unstemmed R2E strategy and activities during LS1
title_short R2E strategy and activities during LS1
title_sort r2e strategy and activities during ls1
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2012-006.225
http://cds.cern.ch/record/1492977
work_keys_str_mv AT perrota r2estrategyandactivitiesduringls1