R2E strategy and activities during LS1
The level of flux of hadrons with energy in the multi MeV range expected from the collimation system at Point 7 and from the collisions at the interaction Points 1, 5 and 8 will induce Single Event Errors (SEE) of the standard electronics present in equipment located around these Points. Such events...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.225 http://cds.cern.ch/record/1492977 |
_version_ | 1780926470673137664 |
---|---|
author | Perrot, A |
author_facet | Perrot, A |
author_sort | Perrot, A |
collection | CERN |
description | The level of flux of hadrons with energy in the multi MeV range expected from the collimation system at Point 7 and from the collisions at the interaction Points 1, 5 and 8 will induce Single Event Errors (SEE) of the standard electronics present in equipment located around these Points. Such events would perturb the LHC operation. As a consequence, within the framework of the R2E (Radiation to Electronics) Mitigation project, the sensitive equipment will be shielded or relocated in safer areas. These mitigations activities will be performed mainly during Long Shutdown 1 (LS1). About 15 groups (including equipment owners) will be involved in these activities with work periods from a few days to several months. Some of them will have to work in parallel in several LHC Points. This document presents these mitigations activities with their associated planning, organization process, and main concerns as identified today. |
id | cern-1492977 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | cern-14929772022-08-10T20:41:28Zdoi:10.5170/CERN-2012-006.225http://cds.cern.ch/record/1492977engPerrot, AR2E strategy and activities during LS1Accelerators and Storage RingsThe level of flux of hadrons with energy in the multi MeV range expected from the collimation system at Point 7 and from the collisions at the interaction Points 1, 5 and 8 will induce Single Event Errors (SEE) of the standard electronics present in equipment located around these Points. Such events would perturb the LHC operation. As a consequence, within the framework of the R2E (Radiation to Electronics) Mitigation project, the sensitive equipment will be shielded or relocated in safer areas. These mitigations activities will be performed mainly during Long Shutdown 1 (LS1). About 15 groups (including equipment owners) will be involved in these activities with work periods from a few days to several months. Some of them will have to work in parallel in several LHC Points. This document presents these mitigations activities with their associated planning, organization process, and main concerns as identified today.CERNoai:cds.cern.ch:14929772012 |
spellingShingle | Accelerators and Storage Rings Perrot, A R2E strategy and activities during LS1 |
title | R2E strategy and activities during LS1 |
title_full | R2E strategy and activities during LS1 |
title_fullStr | R2E strategy and activities during LS1 |
title_full_unstemmed | R2E strategy and activities during LS1 |
title_short | R2E strategy and activities during LS1 |
title_sort | r2e strategy and activities during ls1 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2012-006.225 http://cds.cern.ch/record/1492977 |
work_keys_str_mv | AT perrota r2estrategyandactivitiesduringls1 |