Cargando…
Detector Plans for LS1
All experiments plan an effective usage of the LS1 shutdown period. After three years of running they will go through a consolidation phase, mostly to fix problems that have emerged over time, like single points of failure in the infrastructure, failures of low voltage power supplies and optical lin...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.241 http://cds.cern.ch/record/1492981 |
_version_ | 1780926471517241344 |
---|---|
author | Nessi, M |
author_facet | Nessi, M |
author_sort | Nessi, M |
collection | CERN |
description | All experiments plan an effective usage of the LS1 shutdown period. After three years of running they will go through a consolidation phase, mostly to fix problems that have emerged over time, like single points of failure in the infrastructure, failures of low voltage power supplies and optical links. Upgrades of some detector components will start, mainly related to the beam pipe, the innermost tracker elements and the trigger system. Detector components, which had to be staged for cost reasons in 2003, will then enter into the detector setup. The goal is to be fully ready for the new energy regime at nominal luminosity. |
id | cern-1492981 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | cern-14929812022-08-10T20:41:28Zdoi:10.5170/CERN-2012-006.241http://cds.cern.ch/record/1492981engNessi, MDetector Plans for LS1Accelerators and Storage RingsAll experiments plan an effective usage of the LS1 shutdown period. After three years of running they will go through a consolidation phase, mostly to fix problems that have emerged over time, like single points of failure in the infrastructure, failures of low voltage power supplies and optical links. Upgrades of some detector components will start, mainly related to the beam pipe, the innermost tracker elements and the trigger system. Detector components, which had to be staged for cost reasons in 2003, will then enter into the detector setup. The goal is to be fully ready for the new energy regime at nominal luminosity.CERNoai:cds.cern.ch:14929812012 |
spellingShingle | Accelerators and Storage Rings Nessi, M Detector Plans for LS1 |
title | Detector Plans for LS1 |
title_full | Detector Plans for LS1 |
title_fullStr | Detector Plans for LS1 |
title_full_unstemmed | Detector Plans for LS1 |
title_short | Detector Plans for LS1 |
title_sort | detector plans for ls1 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2012-006.241 http://cds.cern.ch/record/1492981 |
work_keys_str_mv | AT nessim detectorplansforls1 |