Cargando…

Detector Plans for LS1

All experiments plan an effective usage of the LS1 shutdown period. After three years of running they will go through a consolidation phase, mostly to fix problems that have emerged over time, like single points of failure in the infrastructure, failures of low voltage power supplies and optical lin...

Descripción completa

Detalles Bibliográficos
Autor principal: Nessi, M
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.241
http://cds.cern.ch/record/1492981
_version_ 1780926471517241344
author Nessi, M
author_facet Nessi, M
author_sort Nessi, M
collection CERN
description All experiments plan an effective usage of the LS1 shutdown period. After three years of running they will go through a consolidation phase, mostly to fix problems that have emerged over time, like single points of failure in the infrastructure, failures of low voltage power supplies and optical links. Upgrades of some detector components will start, mainly related to the beam pipe, the innermost tracker elements and the trigger system. Detector components, which had to be staged for cost reasons in 2003, will then enter into the detector setup. The goal is to be fully ready for the new energy regime at nominal luminosity.
id cern-1492981
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling cern-14929812022-08-10T20:41:28Zdoi:10.5170/CERN-2012-006.241http://cds.cern.ch/record/1492981engNessi, MDetector Plans for LS1Accelerators and Storage RingsAll experiments plan an effective usage of the LS1 shutdown period. After three years of running they will go through a consolidation phase, mostly to fix problems that have emerged over time, like single points of failure in the infrastructure, failures of low voltage power supplies and optical links. Upgrades of some detector components will start, mainly related to the beam pipe, the innermost tracker elements and the trigger system. Detector components, which had to be staged for cost reasons in 2003, will then enter into the detector setup. The goal is to be fully ready for the new energy regime at nominal luminosity.CERNoai:cds.cern.ch:14929812012
spellingShingle Accelerators and Storage Rings
Nessi, M
Detector Plans for LS1
title Detector Plans for LS1
title_full Detector Plans for LS1
title_fullStr Detector Plans for LS1
title_full_unstemmed Detector Plans for LS1
title_short Detector Plans for LS1
title_sort detector plans for ls1
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2012-006.241
http://cds.cern.ch/record/1492981
work_keys_str_mv AT nessim detectorplansforls1