Detector Plans for LS1
All experiments plan an effective usage of the LS1 shutdown period. After three years of running they will go through a consolidation phase, mostly to fix problems that have emerged over time, like single points of failure in the infrastructure, failures of low voltage power supplies and optical lin...
Autor principal: | Nessi, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.241 http://cds.cern.ch/record/1492981 |
Ejemplares similares
-
LS1 general planning and strategy for the LHC, LHC injectors
por: Foraz, K
Publicado: (2012) -
HL-LHC Planned Activities during LS2 - Accelerator
por: Béjar Alonso, I
Publicado: (2015) -
Post LS1 schedule
por: Lamont, M
Publicado: (2014) -
First look at the recommissioning plans after LS1: HWC-Dry runs - Systems communications
por: Pojer, M
Publicado: (2012) -
LHC Detector Vacuum System Consolidation for Long Shutdown 1 (LS1) in 2013-2014
por: Gallilee, M, et al.
Publicado: (2012)