LS1: electrical engineering upgrades and consolidation

Compared to past shutdowns, the Engineering Department Electrical Engineering (EN-EL) Group's activity volume will be multiplied by about four during LS1. The Group is experienced in handling such situations and will cope with this by transferring manpower from studies to worksite supervision a...

Descripción completa

Detalles Bibliográficos
Autor principal: Duval, F
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.248
http://cds.cern.ch/record/1492985
Descripción
Sumario:Compared to past shutdowns, the Engineering Department Electrical Engineering (EN-EL) Group's activity volume will be multiplied by about four during LS1. The Group is experienced in handling such situations and will cope with this by transferring manpower from studies to worksite supervision and thanks to its subcontractors who know how to increase their manpower in such a manner as to maintain a good level of professionalism. EN-EL is substantially increasing its resources to cope with this workload. This increase in resources is, however, limited by the management capacity of EN-EL's core staff. As a consequence, not all of the requested activities will be possible and prioritization will be necessary. This paper details the upgrades and the consolidation to be carried out during LS1 and the measures taken by EN-EL to cope with this heavy workload.