Cargando…
LS1: electrical engineering upgrades and consolidation
Compared to past shutdowns, the Engineering Department Electrical Engineering (EN-EL) Group's activity volume will be multiplied by about four during LS1. The Group is experienced in handling such situations and will cope with this by transferring manpower from studies to worksite supervision a...
Autor principal: | Duval, F |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.248 http://cds.cern.ch/record/1492985 |
Ejemplares similares
-
EN-CV during LS1: upgrade, consolidation, maintenance, operation
por: Nonis, M
Publicado: (2012) -
SPS Consolidation for LS2 and Beyond
por: Ridewood, J
Publicado: (2015) -
PSB and PS Consolidation For LS2 and Beyond
por: Gilardoni, S, et al.
Publicado: (2015) -
Consolidation of the LHC superconducting magnets and circuits during LS1
por: Tock, J Ph
Publicado: (2012) -
LHC Vacuum Upgrade during LS1
por: Jimenez, J M, et al.
Publicado: (2012)