EN-CV during LS1: upgrade, consolidation, maintenance, operation
The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are relat...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.252 http://cds.cern.ch/record/1492987 |
_version_ | 1780926472610906112 |
---|---|
author | Nonis, M |
author_facet | Nonis, M |
author_sort | Nonis, M |
collection | CERN |
description | The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group. |
id | cern-1492987 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | cern-14929872022-08-10T20:41:29Zdoi:10.5170/CERN-2012-006.252http://cds.cern.ch/record/1492987engNonis, MEN-CV during LS1: upgrade, consolidation, maintenance, operationAccelerators and Storage RingsThe Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group.CERNoai:cds.cern.ch:14929872012 |
spellingShingle | Accelerators and Storage Rings Nonis, M EN-CV during LS1: upgrade, consolidation, maintenance, operation |
title | EN-CV during LS1: upgrade, consolidation, maintenance, operation |
title_full | EN-CV during LS1: upgrade, consolidation, maintenance, operation |
title_fullStr | EN-CV during LS1: upgrade, consolidation, maintenance, operation |
title_full_unstemmed | EN-CV during LS1: upgrade, consolidation, maintenance, operation |
title_short | EN-CV during LS1: upgrade, consolidation, maintenance, operation |
title_sort | en-cv during ls1: upgrade, consolidation, maintenance, operation |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2012-006.252 http://cds.cern.ch/record/1492987 |
work_keys_str_mv | AT nonism encvduringls1upgradeconsolidationmaintenanceoperation |