EN-CV during LS1: upgrade, consolidation, maintenance, operation

The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are relat...

Descripción completa

Detalles Bibliográficos
Autor principal: Nonis, M
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.252
http://cds.cern.ch/record/1492987
_version_ 1780926472610906112
author Nonis, M
author_facet Nonis, M
author_sort Nonis, M
collection CERN
description The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group.
id cern-1492987
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling cern-14929872022-08-10T20:41:29Zdoi:10.5170/CERN-2012-006.252http://cds.cern.ch/record/1492987engNonis, MEN-CV during LS1: upgrade, consolidation, maintenance, operationAccelerators and Storage RingsThe Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group.CERNoai:cds.cern.ch:14929872012
spellingShingle Accelerators and Storage Rings
Nonis, M
EN-CV during LS1: upgrade, consolidation, maintenance, operation
title EN-CV during LS1: upgrade, consolidation, maintenance, operation
title_full EN-CV during LS1: upgrade, consolidation, maintenance, operation
title_fullStr EN-CV during LS1: upgrade, consolidation, maintenance, operation
title_full_unstemmed EN-CV during LS1: upgrade, consolidation, maintenance, operation
title_short EN-CV during LS1: upgrade, consolidation, maintenance, operation
title_sort en-cv during ls1: upgrade, consolidation, maintenance, operation
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2012-006.252
http://cds.cern.ch/record/1492987
work_keys_str_mv AT nonism encvduringls1upgradeconsolidationmaintenanceoperation