Cargando…
EN-CV during LS1: upgrade, consolidation, maintenance, operation
The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are relat...
Autor principal: | Nonis, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.252 http://cds.cern.ch/record/1492987 |
Ejemplares similares
-
LS1: electrical engineering upgrades and consolidation
por: Duval, F
Publicado: (2012) -
LHC Vacuum Upgrade during LS1
por: Jimenez, J M, et al.
Publicado: (2012) -
Consolidation of the LHC superconducting magnets and circuits during LS1
por: Tock, J Ph
Publicado: (2012) -
SPS Consolidation for LS2 and Beyond
por: Ridewood, J
Publicado: (2015) -
QPS upgrade and machine protection during LS1
por: Denz, R
Publicado: (2012)