Cargando…
Energy of the LHC after the 2013-2014 Shutdown
In 2008 all the LHC main dipole circuits were trained to 5 TeV, two sectors to 6 TeV, and one sector was pushed up to 6.6 TeV. In the 5-6 TeV range, a few quenches were needed to retrain the LHC dipoles, and none for the quadrupoles. On the other hand, in the 6-7 TeV range a larger than expected num...
Autores principales: | Todesco, E, Lorin, C, Bajko, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.265 http://cds.cern.ch/record/1492993 |
Ejemplares similares
-
LHC Detector Vacuum System Consolidation for Long Shutdown 1 (LS1) in 2013-2014
por: Gallilee, M, et al.
Publicado: (2012) -
Long Shutdown 2 @ LHC
por: Bernardini, M, et al.
Publicado: (2015) -
The Second LHC Long Shutdown (LS2) for the Superconducting Magnets
por: Tock, Jean-Philippe, et al.
Publicado: (2018) -
LHC Long Shutdown: A Parenthesis for a Challenge
por: Foraz, K, et al.
Publicado: (2013) -
What are the consequences of delaying the shutdown from 2012 to 2013 for Radiation Protection?
por: Roesler, S, et al.
Publicado: (2011)