Performance potential of the injectors after LS1

The main upgrades of the injector chain in the framework of the LIU project will only be implemented in the second long shutdown (LS2), in particular the increase of the PSB energy to 2 GeV or the implementation of cures/solutions against instabilities/e-cloud effects. On the other hand, Linac4 will...

Descripción completa

Detalles Bibliográficos
Autores principales: Bartosik, H, Carli, C, Damerau, H, Garoby, R, Gilardoni, S, Goddard, B, Hancock, S, Hanke, K, Lombardi, A, Mikulec, B, Raginel, V, Rumolo, G, Shaposhnikova, E, Vretenar, M
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.268
http://cds.cern.ch/record/1492996
_version_ 1780926473504292864
author Bartosik, H
Carli, C
Damerau, H
Garoby, R
Gilardoni, S
Goddard, B
Hancock, S
Hanke, K
Lombardi, A
Mikulec, B
Raginel, V
Rumolo, G
Shaposhnikova, E
Vretenar, M
author_facet Bartosik, H
Carli, C
Damerau, H
Garoby, R
Gilardoni, S
Goddard, B
Hancock, S
Hanke, K
Lombardi, A
Mikulec, B
Raginel, V
Rumolo, G
Shaposhnikova, E
Vretenar, M
author_sort Bartosik, H
collection CERN
description The main upgrades of the injector chain in the framework of the LIU project will only be implemented in the second long shutdown (LS2), in particular the increase of the PSB energy to 2 GeV or the implementation of cures/solutions against instabilities/e-cloud effects. On the other hand, Linac4 will become available by the end of 2014. Until the end of 2015 it may replace Linac2 at short notice, taking 50 MeV protons in the PSB via the existing injection system but with reduced performance. Afterwards, the H- injection equipment will be ready and Linac4 could be connected for 160MeV H- injection into the PSB during a prolonged winter shutdown before LS2. The anticipated beam performance of the LHC injectors after LS1 in these different cases is presented. Space charge on the PS flat-bottom will remain a limitation because the PSB to PS transfer energy will stay at 1.4 GeV. As a mitigation measure new RF manipulations are presented which can improve brightness for 25 ns bunch spacing, allowing for more than nominal luminosity in the LHC.
id cern-1492996
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling cern-14929962022-08-10T20:41:30Zdoi:10.5170/CERN-2012-006.268http://cds.cern.ch/record/1492996engBartosik, HCarli, CDamerau, HGaroby, RGilardoni, SGoddard, BHancock, SHanke, KLombardi, AMikulec, BRaginel, VRumolo, GShaposhnikova, EVretenar, MPerformance potential of the injectors after LS1Accelerators and Storage RingsThe main upgrades of the injector chain in the framework of the LIU project will only be implemented in the second long shutdown (LS2), in particular the increase of the PSB energy to 2 GeV or the implementation of cures/solutions against instabilities/e-cloud effects. On the other hand, Linac4 will become available by the end of 2014. Until the end of 2015 it may replace Linac2 at short notice, taking 50 MeV protons in the PSB via the existing injection system but with reduced performance. Afterwards, the H- injection equipment will be ready and Linac4 could be connected for 160MeV H- injection into the PSB during a prolonged winter shutdown before LS2. The anticipated beam performance of the LHC injectors after LS1 in these different cases is presented. Space charge on the PS flat-bottom will remain a limitation because the PSB to PS transfer energy will stay at 1.4 GeV. As a mitigation measure new RF manipulations are presented which can improve brightness for 25 ns bunch spacing, allowing for more than nominal luminosity in the LHC.CERNoai:cds.cern.ch:14929962012
spellingShingle Accelerators and Storage Rings
Bartosik, H
Carli, C
Damerau, H
Garoby, R
Gilardoni, S
Goddard, B
Hancock, S
Hanke, K
Lombardi, A
Mikulec, B
Raginel, V
Rumolo, G
Shaposhnikova, E
Vretenar, M
Performance potential of the injectors after LS1
title Performance potential of the injectors after LS1
title_full Performance potential of the injectors after LS1
title_fullStr Performance potential of the injectors after LS1
title_full_unstemmed Performance potential of the injectors after LS1
title_short Performance potential of the injectors after LS1
title_sort performance potential of the injectors after ls1
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2012-006.268
http://cds.cern.ch/record/1492996
work_keys_str_mv AT bartosikh performancepotentialoftheinjectorsafterls1
AT carlic performancepotentialoftheinjectorsafterls1
AT damerauh performancepotentialoftheinjectorsafterls1
AT garobyr performancepotentialoftheinjectorsafterls1
AT gilardonis performancepotentialoftheinjectorsafterls1
AT goddardb performancepotentialoftheinjectorsafterls1
AT hancocks performancepotentialoftheinjectorsafterls1
AT hankek performancepotentialoftheinjectorsafterls1
AT lombardia performancepotentialoftheinjectorsafterls1
AT mikulecb performancepotentialoftheinjectorsafterls1
AT raginelv performancepotentialoftheinjectorsafterls1
AT rumolog performancepotentialoftheinjectorsafterls1
AT shaposhnikovae performancepotentialoftheinjectorsafterls1
AT vretenarm performancepotentialoftheinjectorsafterls1