Performance potential of the injectors after LS1
The main upgrades of the injector chain in the framework of the LIU project will only be implemented in the second long shutdown (LS2), in particular the increase of the PSB energy to 2 GeV or the implementation of cures/solutions against instabilities/e-cloud effects. On the other hand, Linac4 will...
Autores principales: | , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.268 http://cds.cern.ch/record/1492996 |
_version_ | 1780926473504292864 |
---|---|
author | Bartosik, H Carli, C Damerau, H Garoby, R Gilardoni, S Goddard, B Hancock, S Hanke, K Lombardi, A Mikulec, B Raginel, V Rumolo, G Shaposhnikova, E Vretenar, M |
author_facet | Bartosik, H Carli, C Damerau, H Garoby, R Gilardoni, S Goddard, B Hancock, S Hanke, K Lombardi, A Mikulec, B Raginel, V Rumolo, G Shaposhnikova, E Vretenar, M |
author_sort | Bartosik, H |
collection | CERN |
description | The main upgrades of the injector chain in the framework of the LIU project will only be implemented in the second long shutdown (LS2), in particular the increase of the PSB energy to 2 GeV or the implementation of cures/solutions against instabilities/e-cloud effects. On the other hand, Linac4 will become available by the end of 2014. Until the end of 2015 it may replace Linac2 at short notice, taking 50 MeV protons in the PSB via the existing injection system but with reduced performance. Afterwards, the H- injection equipment will be ready and Linac4 could be connected for 160MeV H- injection into the PSB during a prolonged winter shutdown before LS2. The anticipated beam performance of the LHC injectors after LS1 in these different cases is presented. Space charge on the PS flat-bottom will remain a limitation because the PSB to PS transfer energy will stay at 1.4 GeV. As a mitigation measure new RF manipulations are presented which can improve brightness for 25 ns bunch spacing, allowing for more than nominal luminosity in the LHC. |
id | cern-1492996 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
publisher | CERN |
record_format | invenio |
spelling | cern-14929962022-08-10T20:41:30Zdoi:10.5170/CERN-2012-006.268http://cds.cern.ch/record/1492996engBartosik, HCarli, CDamerau, HGaroby, RGilardoni, SGoddard, BHancock, SHanke, KLombardi, AMikulec, BRaginel, VRumolo, GShaposhnikova, EVretenar, MPerformance potential of the injectors after LS1Accelerators and Storage RingsThe main upgrades of the injector chain in the framework of the LIU project will only be implemented in the second long shutdown (LS2), in particular the increase of the PSB energy to 2 GeV or the implementation of cures/solutions against instabilities/e-cloud effects. On the other hand, Linac4 will become available by the end of 2014. Until the end of 2015 it may replace Linac2 at short notice, taking 50 MeV protons in the PSB via the existing injection system but with reduced performance. Afterwards, the H- injection equipment will be ready and Linac4 could be connected for 160MeV H- injection into the PSB during a prolonged winter shutdown before LS2. The anticipated beam performance of the LHC injectors after LS1 in these different cases is presented. Space charge on the PS flat-bottom will remain a limitation because the PSB to PS transfer energy will stay at 1.4 GeV. As a mitigation measure new RF manipulations are presented which can improve brightness for 25 ns bunch spacing, allowing for more than nominal luminosity in the LHC.CERNoai:cds.cern.ch:14929962012 |
spellingShingle | Accelerators and Storage Rings Bartosik, H Carli, C Damerau, H Garoby, R Gilardoni, S Goddard, B Hancock, S Hanke, K Lombardi, A Mikulec, B Raginel, V Rumolo, G Shaposhnikova, E Vretenar, M Performance potential of the injectors after LS1 |
title | Performance potential of the injectors after LS1 |
title_full | Performance potential of the injectors after LS1 |
title_fullStr | Performance potential of the injectors after LS1 |
title_full_unstemmed | Performance potential of the injectors after LS1 |
title_short | Performance potential of the injectors after LS1 |
title_sort | performance potential of the injectors after ls1 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2012-006.268 http://cds.cern.ch/record/1492996 |
work_keys_str_mv | AT bartosikh performancepotentialoftheinjectorsafterls1 AT carlic performancepotentialoftheinjectorsafterls1 AT damerauh performancepotentialoftheinjectorsafterls1 AT garobyr performancepotentialoftheinjectorsafterls1 AT gilardonis performancepotentialoftheinjectorsafterls1 AT goddardb performancepotentialoftheinjectorsafterls1 AT hancocks performancepotentialoftheinjectorsafterls1 AT hankek performancepotentialoftheinjectorsafterls1 AT lombardia performancepotentialoftheinjectorsafterls1 AT mikulecb performancepotentialoftheinjectorsafterls1 AT raginelv performancepotentialoftheinjectorsafterls1 AT rumolog performancepotentialoftheinjectorsafterls1 AT shaposhnikovae performancepotentialoftheinjectorsafterls1 AT vretenarm performancepotentialoftheinjectorsafterls1 |