Performance potential of the injectors after LS1
The main upgrades of the injector chain in the framework of the LIU project will only be implemented in the second long shutdown (LS2), in particular the increase of the PSB energy to 2 GeV or the implementation of cures/solutions against instabilities/e-cloud effects. On the other hand, Linac4 will...
Autores principales: | Bartosik, H, Carli, C, Damerau, H, Garoby, R, Gilardoni, S, Goddard, B, Hancock, S, Hanke, K, Lombardi, A, Mikulec, B, Raginel, V, Rumolo, G, Shaposhnikova, E, Vretenar, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.268 http://cds.cern.ch/record/1492996 |
Ejemplares similares
-
Can the proton injectors meet the HL-LHC requirements after LS2?
por: Goddard, B, et al.
Publicado: (2012) -
Upgrade Plans for the LHC injector complex
por: Damerau, H, et al.
Publicado: (2012) -
LHC Injectors Upgrade, Technical Design Report
por: Damerau, H, et al.
Publicado: (2014) -
Post ST LS1 25 NS and 50 NS options from the injectors
por: Steerenberg, R, et al.
Publicado: (2012) -
Performance reach of the injectors in 2011
por: Steerenberg, R, et al.
Publicado: (2011)