Cargando…
Can the proton injectors meet the HL-LHC requirements after LS2?
The LIU project has as mandate the upgrade of the LHC injector chain to match the requirements of HL-LHC. The present planning assumes that the upgrade work will be completed in LS2, for commissioning in the following operational year. The known limitations in the different injectors are described,...
Autores principales: | Goddard, B, Bartosik, H, Bracco, C, Brüning, O, Carli, C, Cornelis, K, Damerau, H, Garoby, R, Gilardoni, S, Hancock, S, Hanke, K, Kain, V, Meddahi, M, Mikulec, B, Papaphilippou, Y, Rumolo, G, Shaposhnikova, E, Steerenberg, R, Vretenar, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2012-006.325 http://cds.cern.ch/record/1493023 |
Ejemplares similares
-
Performance potential of the injectors after LS1
por: Bartosik, H, et al.
Publicado: (2012) -
LIU: which beams in the injectors fulfill HL-LHC upgrade scenario 1 goals?
por: Gilardoni, S, et al.
Publicado: (2014) -
Post ST LS1 25 NS and 50 NS options from the injectors
por: Steerenberg, R, et al.
Publicado: (2012) -
Status and Plans for the Upgrade of the LHC Injectors
por: Garoby, R, et al.
Publicado: (2013) -
Upgrade Plans for the LHC injector complex
por: Damerau, H, et al.
Publicado: (2012)