Cargando…

SPS: scrubbing or coating ?

The operation of the SPS with high intensity bunched beams is limited by the electron cloud building-up in both the arcs and long straight sections. Two consolidation options have been considered: mitigation of the electron cloud using coatings or relying, as before, on the scrubbing runs. A status...

Descripción completa

Detalles Bibliográficos
Autor principal: Jimenez, J M
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2012-006.339
http://cds.cern.ch/record/1493027
_version_ 1780926480908288000
author Jimenez, J M
author_facet Jimenez, J M
author_sort Jimenez, J M
collection CERN
description The operation of the SPS with high intensity bunched beams is limited by the electron cloud building-up in both the arcs and long straight sections. Two consolidation options have been considered: mitigation of the electron cloud using coatings or relying, as before, on the scrubbing runs. A status report on both options will be given with a particular emphasis on measurements plans for 2012 and pending issues. The testing needs, corresponding beam parameters and MD time in 2012 will be addressed. The criteria for the decision making and the corresponding schedule will be discussed.
id cern-1493027
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling cern-14930272022-08-10T20:41:34Zdoi:10.5170/CERN-2012-006.339http://cds.cern.ch/record/1493027engJimenez, J MSPS: scrubbing or coating ?Accelerators and Storage RingsThe operation of the SPS with high intensity bunched beams is limited by the electron cloud building-up in both the arcs and long straight sections. Two consolidation options have been considered: mitigation of the electron cloud using coatings or relying, as before, on the scrubbing runs. A status report on both options will be given with a particular emphasis on measurements plans for 2012 and pending issues. The testing needs, corresponding beam parameters and MD time in 2012 will be addressed. The criteria for the decision making and the corresponding schedule will be discussed.CERNoai:cds.cern.ch:14930272012
spellingShingle Accelerators and Storage Rings
Jimenez, J M
SPS: scrubbing or coating ?
title SPS: scrubbing or coating ?
title_full SPS: scrubbing or coating ?
title_fullStr SPS: scrubbing or coating ?
title_full_unstemmed SPS: scrubbing or coating ?
title_short SPS: scrubbing or coating ?
title_sort sps: scrubbing or coating ?
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2012-006.339
http://cds.cern.ch/record/1493027
work_keys_str_mv AT jimenezjm spsscrubbingorcoating