Cargando…

Results on nominal collimator settings MD at 4 TeV

The goal of the MD performed on June 24th 2012 was to achieve the nominal 7 TeV settings in mm with nominal single bunch intensities using centers from the beam-based alignment of March 2012. The secondary collimators and absorbers in IR7 and the dump protection collimators were moved in from the cu...

Descripción completa

Detalles Bibliográficos
Autores principales: Salvachua, B, Assmann, RW, Burov, A, Bruce, R, Cauchi, M, Deboy, D, Lari, L, Marsili, A, Metral, E, Mounet, N, Redaelli, S, Salvant, B, Valentino, G, Previtali, V
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1494126

Ejemplares similares