RF Observations during High Pile-up MD
The MD was performed on July 10th with the nominal RF setup. Two bunches of approximately 3e11 protons were injected in each ring, in buckets 17821 and 27541. Three fills were attempted with this intensity (2823-2825). There were issues with the longitudinal emittance blowup for Beam 1 during the f...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1497692 |
_version_ | 1780926691396288512 |
---|---|
author | Mastoridis, T Baudrenghien, P |
author_facet | Mastoridis, T Baudrenghien, P |
author_sort | Mastoridis, T |
collection | CERN |
description | The MD was performed on July 10th with the nominal RF setup. Two bunches of approximately 3e11 protons were injected in each ring, in buckets 17821 and 27541. Three fills were attempted with this intensity (2823-2825). There were issues with the longitudinal emittance blowup for Beam 1 during the first two fills. The blow-up did not work in filll 2823, whereas in fill 2824 it was started manually late in the ramp and was really active only at the beginning of flat top. The problem was traced to an RF controls issue. These issues inadvertently provided very useful information on longitudinal stability. |
id | cern-1497692 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-14976922019-09-30T06:29:59Zhttp://cds.cern.ch/record/1497692engMastoridis, TBaudrenghien, PRF Observations during High Pile-up MDAccelerators and Storage RingsThe MD was performed on July 10th with the nominal RF setup. Two bunches of approximately 3e11 protons were injected in each ring, in buckets 17821 and 27541. Three fills were attempted with this intensity (2823-2825). There were issues with the longitudinal emittance blowup for Beam 1 during the first two fills. The blow-up did not work in filll 2823, whereas in fill 2824 it was started manually late in the ramp and was really active only at the beginning of flat top. The problem was traced to an RF controls issue. These issues inadvertently provided very useful information on longitudinal stability.CERN-ATS-Note-2012-099 MDoai:cds.cern.ch:14976922012-12-05 |
spellingShingle | Accelerators and Storage Rings Mastoridis, T Baudrenghien, P RF Observations during High Pile-up MD |
title | RF Observations during High Pile-up MD |
title_full | RF Observations during High Pile-up MD |
title_fullStr | RF Observations during High Pile-up MD |
title_full_unstemmed | RF Observations during High Pile-up MD |
title_short | RF Observations during High Pile-up MD |
title_sort | rf observations during high pile-up md |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1497692 |
work_keys_str_mv | AT mastoridist rfobservationsduringhighpileupmd AT baudrenghienp rfobservationsduringhighpileupmd |