Cargando…
Multi-Agent Based Beam Search for Real-Time Production Scheduling and Control: Method, Software and Industrial Application
The Multi-Agent Based Beam Search (MABBS) method systematically integrates four major requirements of manufacturing production - representation capability, solution quality, computation efficiency, and implementation difficulty - within a unified framework to deal with the many challenges of complex...
Autores principales: | Kang, Shu Gang, Choi, Shiu Hong |
---|---|
Lenguaje: | eng |
Publicado: |
Springer
2013
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1007/978-1-4471-4576-9 http://cds.cern.ch/record/1500159 |
Ejemplares similares
-
Multiprocessor scheduling for real-time systems
por: Baruah, Sanjoy, et al.
Publicado: (2015) -
Scheduling real-time streaming applications onto an embedded multiprocessor
por: Moreira, Orlando, et al.
Publicado: (2014) -
Software Support for Industrial Controls Contract
por: Sánchez-Corral, E, et al.
Publicado: (2001) -
Modern Industrial Automation Software Design
por: Wang, Lingfeng, et al.
Publicado: (2006) -
DSP Software Development Techniques for Embedded and Real-Time Systems
por: Oshana, Robert
Publicado: (2005)