Cargando…
An Improved Insulation System for the LHC Main 13 kA Interconnection Splices
In 2013, a long shutdown of the Large Hadron Collider (LHC) at CERN will allow comprehensive maintenance plus consolidation of the machine components, in particular of the 13 kA circuits that feed the main superconducting magnets around the 27-km ring. This shutdown will prepare the accelerator for...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1516043 |
_version_ | 1780928430415544320 |
---|---|
author | Lackner, F Savary, F Prin, H Perin, A |
author_facet | Lackner, F Savary, F Prin, H Perin, A |
author_sort | Lackner, F |
collection | CERN |
description | In 2013, a long shutdown of the Large Hadron Collider (LHC) at CERN will allow comprehensive maintenance plus consolidation of the machine components, in particular of the 13 kA circuits that feed the main superconducting magnets around the 27-km ring. This shutdown will prepare the accelerator for operation at nominal energy, 14 TeV, with adequate margin on the critical performance parameters. An essential part of the consolidation program consists of adding to the 13 kA splices of the magnet interconnects a copper shunt of high RRR (> 300) that will carry the current in the event of a busbar quench. An important R&D program was conducted in 2010 to design a sound solution for the shunt and for an improved insulation system. The development of the insulation system has required iterations aiming at adequate solution. The functional requirements for the insulation are a breakdown voltage of at least 3.1 kV in superfluid helium and sufficient mechanical strength to withstand stresses of the order of 50 MPa. The insulation system shall provide mechanical restraint for the shunted splices so that their transversal deflection is limited to 0.25 mm. This paper describes the final design of the insulation and the optimization process. The results from dielectric tests and numerical optimization of the insulation cover will be also presented. Finally the performance of the new insulation will be compared to the previous version. |
id | cern-1516043 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-15160432019-09-30T06:29:59Zhttp://cds.cern.ch/record/1516043engLackner, FSavary, FPrin, HPerin, AAn Improved Insulation System for the LHC Main 13 kA Interconnection SplicesAccelerators and Storage RingsIn 2013, a long shutdown of the Large Hadron Collider (LHC) at CERN will allow comprehensive maintenance plus consolidation of the machine components, in particular of the 13 kA circuits that feed the main superconducting magnets around the 27-km ring. This shutdown will prepare the accelerator for operation at nominal energy, 14 TeV, with adequate margin on the critical performance parameters. An essential part of the consolidation program consists of adding to the 13 kA splices of the magnet interconnects a copper shunt of high RRR (> 300) that will carry the current in the event of a busbar quench. An important R&D program was conducted in 2010 to design a sound solution for the shunt and for an improved insulation system. The development of the insulation system has required iterations aiming at adequate solution. The functional requirements for the insulation are a breakdown voltage of at least 3.1 kV in superfluid helium and sufficient mechanical strength to withstand stresses of the order of 50 MPa. The insulation system shall provide mechanical restraint for the shunted splices so that their transversal deflection is limited to 0.25 mm. This paper describes the final design of the insulation and the optimization process. The results from dielectric tests and numerical optimization of the insulation cover will be also presented. Finally the performance of the new insulation will be compared to the previous version.CERN-ATS-2013-021oai:cds.cern.ch:15160432013-02-14 |
spellingShingle | Accelerators and Storage Rings Lackner, F Savary, F Prin, H Perin, A An Improved Insulation System for the LHC Main 13 kA Interconnection Splices |
title | An Improved Insulation System for the LHC Main 13 kA Interconnection Splices |
title_full | An Improved Insulation System for the LHC Main 13 kA Interconnection Splices |
title_fullStr | An Improved Insulation System for the LHC Main 13 kA Interconnection Splices |
title_full_unstemmed | An Improved Insulation System for the LHC Main 13 kA Interconnection Splices |
title_short | An Improved Insulation System for the LHC Main 13 kA Interconnection Splices |
title_sort | improved insulation system for the lhc main 13 ka interconnection splices |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1516043 |
work_keys_str_mv | AT lacknerf animprovedinsulationsystemforthelhcmain13kainterconnectionsplices AT savaryf animprovedinsulationsystemforthelhcmain13kainterconnectionsplices AT prinh animprovedinsulationsystemforthelhcmain13kainterconnectionsplices AT perina animprovedinsulationsystemforthelhcmain13kainterconnectionsplices AT lacknerf improvedinsulationsystemforthelhcmain13kainterconnectionsplices AT savaryf improvedinsulationsystemforthelhcmain13kainterconnectionsplices AT prinh improvedinsulationsystemforthelhcmain13kainterconnectionsplices AT perina improvedinsulationsystemforthelhcmain13kainterconnectionsplices |