An Improved Insulation System for the LHC Main 13 kA Interconnection Splices
In 2013, a long shutdown of the Large Hadron Collider (LHC) at CERN will allow comprehensive maintenance plus consolidation of the machine components, in particular of the 13 kA circuits that feed the main superconducting magnets around the 27-km ring. This shutdown will prepare the accelerator for...
Autores principales: | Lackner, F, Savary, F, Prin, H, Perin, A |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1516043 |
Ejemplares similares
-
Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
por: Lackner, F, et al.
Publicado: (2012) -
Consolidation of the 13 kA Splices in the Electrical Feedboxes of the LHC
por: Perin, A, et al.
Publicado: (2012) -
Consolidation of the 13-kA Superconducting Magnet Circuits of the LHC at CERN
por: Lackner, F, et al.
Publicado: (2015) -
Analysis of Defective Interconnections of the 13 kA LHC Superconducting Bus Bars
por: Granieri, P P, et al.
Publicado: (2012) -
Quality Assurance of the 13-kA Superconducting Magnet Circuits Consolidation of the LHC at CERN
por: Principe, R, et al.