Cargando…

An Improved Insulation System for the LHC Main 13 kA Interconnection Splices

In 2013, a long shutdown of the Large Hadron Collider (LHC) at CERN will allow comprehensive maintenance plus consolidation of the machine components, in particular of the 13 kA circuits that feed the main superconducting magnets around the 27-km ring. This shutdown will prepare the accelerator for...

Descripción completa

Detalles Bibliográficos
Autores principales: Lackner, F, Savary, F, Prin, H, Perin, A
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1516043

Ejemplares similares