Cargando…
Beam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDE
The feasibility of using an external multi-harmonic buncher placed before the existing RFQ at REX-ISOLDE to increase the bunch spacing of post-accelerated beams at HIE-ISOLDE was confirmed. It was found that with a pre-buncher operating at a subharmonic frequency of 10.128 MHz (a factor 10 below the...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1517514 |
_version_ | 1780928539439136768 |
---|---|
author | Magdau, I B Fraser, M |
author_facet | Magdau, I B Fraser, M |
author_sort | Magdau, I B |
collection | CERN |
description | The feasibility of using an external multi-harmonic buncher placed before the existing RFQ at REX-ISOLDE to increase the bunch spacing of post-accelerated beams at HIE-ISOLDE was confirmed. It was found that with a pre-buncher operating at a subharmonic frequency of 10.128 MHz (a factor 10 below the fundamental frequency of the RFQ) transmissions as high as 80% could be achieved in the main bunches separated by 98.7 ns. Such a time-structure will allow particle identification employing time-offlight techniques to be carried out by the users at HIE-ISOLDE. The optimal effective voltage for a drift length of 1.4 m between the pre-buncher and RFQ was found to be Veff = 0:8 kV, without any deterioration in the simulated nominal rms longitudinal emittance of rms = 0:28 ns keV/u. Significant reduction in the rms longitudinal emittance formed inside the RFQ was observed as the drift distance between the pre-buncher and RFQ was increased and the energy spread imparted by the pre-buncher decreased; within the physical constraints of the beam line a reduction factor of 2 was observed for a drift length of 4:0 m, demanding Veff = 0:3 kV. A chopper will be needed to remove the 15% of beam populating the 101.28 MHz satellite bunches. |
id | cern-1517514 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-15175142019-09-30T06:29:59Zhttp://cds.cern.ch/record/1517514engMagdau, I BFraser, MBeam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDEAccelerators and Storage RingsThe feasibility of using an external multi-harmonic buncher placed before the existing RFQ at REX-ISOLDE to increase the bunch spacing of post-accelerated beams at HIE-ISOLDE was confirmed. It was found that with a pre-buncher operating at a subharmonic frequency of 10.128 MHz (a factor 10 below the fundamental frequency of the RFQ) transmissions as high as 80% could be achieved in the main bunches separated by 98.7 ns. Such a time-structure will allow particle identification employing time-offlight techniques to be carried out by the users at HIE-ISOLDE. The optimal effective voltage for a drift length of 1.4 m between the pre-buncher and RFQ was found to be Veff = 0:8 kV, without any deterioration in the simulated nominal rms longitudinal emittance of rms = 0:28 ns keV/u. Significant reduction in the rms longitudinal emittance formed inside the RFQ was observed as the drift distance between the pre-buncher and RFQ was increased and the energy spread imparted by the pre-buncher decreased; within the physical constraints of the beam line a reduction factor of 2 was observed for a drift length of 4:0 m, demanding Veff = 0:3 kV. A chopper will be needed to remove the 15% of beam populating the 101.28 MHz satellite bunches.HIE-ISOLDE-PROJECT-Note-0015CERN-HIE-ISOLDE-PROJECT-Note-0015oai:cds.cern.ch:15175142013-02-20 |
spellingShingle | Accelerators and Storage Rings Magdau, I B Fraser, M Beam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDE |
title | Beam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDE |
title_full | Beam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDE |
title_fullStr | Beam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDE |
title_full_unstemmed | Beam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDE |
title_short | Beam Dynamics Feasibility Study for an RFQ Sub-harmonic Pre-buncher at REX-ISOLDE |
title_sort | beam dynamics feasibility study for an rfq sub-harmonic pre-buncher at rex-isolde |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1517514 |
work_keys_str_mv | AT magdauib beamdynamicsfeasibilitystudyforanrfqsubharmonicprebuncheratrexisolde AT fraserm beamdynamicsfeasibilitystudyforanrfqsubharmonicprebuncheratrexisolde |