Status of the Superconducting RF Activities for the HIE ISOLDE Project

The planned upgrade of the REX ISOLDE facility at CERN will boost the energy of the machine from 3 MeV/u up to 10 MeV/u with beams of mass-to-charge ratio 2.5 < A/q < 4. For this purpose, a new superconducting post accelerator based on independently phased 101.28 MHz Quarter Wave Resonato...

Descripción completa

Detalles Bibliográficos
Autores principales: Venturini Delsolaro, W, Calatroni, S, Capatina, O, Valuch, D, Therasse, M, Jecklin, N, Kadi, Y, Maesen, P, Fraser, M A, Montesinos, E, Delaup, B, Mondino, I
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1555428
_version_ 1780930445810073600
author Venturini Delsolaro, W
Calatroni, S
Capatina, O
Valuch, D
Therasse, M
Jecklin, N
Kadi, Y
Maesen, P
Fraser, M A
Montesinos, E
Delaup, B
Mondino, I
author_facet Venturini Delsolaro, W
Calatroni, S
Capatina, O
Valuch, D
Therasse, M
Jecklin, N
Kadi, Y
Maesen, P
Fraser, M A
Montesinos, E
Delaup, B
Mondino, I
author_sort Venturini Delsolaro, W
collection CERN
description The planned upgrade of the REX ISOLDE facility at CERN will boost the energy of the machine from 3 MeV/u up to 10 MeV/u with beams of mass-to-charge ratio 2.5 < A/q < 4. For this purpose, a new superconducting post accelerator based on independently phased 101.28 MHz Quarter Wave Resonators (QWR) will replace part of the normal conducting Linac. The QWRs make use of the Niobium sputtering on Copper technology which was successfully applied to LEP2, LHC and to the energy upgrade of the ALPI Linac at INFNLNL. The status of advancement of the project will be detailed, limited to the SRF activities.
id cern-1555428
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-15554282022-08-17T13:32:31Zhttp://cds.cern.ch/record/1555428engVenturini Delsolaro, WCalatroni, SCapatina, OValuch, DTherasse, MJecklin, NKadi, YMaesen, PFraser, M AMontesinos, EDelaup, BMondino, IStatus of the Superconducting RF Activities for the HIE ISOLDE ProjectAccelerators and Storage RingsThe planned upgrade of the REX ISOLDE facility at CERN will boost the energy of the machine from 3 MeV/u up to 10 MeV/u with beams of mass-to-charge ratio 2.5 < A/q < 4. For this purpose, a new superconducting post accelerator based on independently phased 101.28 MHz Quarter Wave Resonators (QWR) will replace part of the normal conducting Linac. The QWRs make use of the Niobium sputtering on Copper technology which was successfully applied to LEP2, LHC and to the energy upgrade of the ALPI Linac at INFNLNL. The status of advancement of the project will be detailed, limited to the SRF activities.oai:cds.cern.ch:15554282013
spellingShingle Accelerators and Storage Rings
Venturini Delsolaro, W
Calatroni, S
Capatina, O
Valuch, D
Therasse, M
Jecklin, N
Kadi, Y
Maesen, P
Fraser, M A
Montesinos, E
Delaup, B
Mondino, I
Status of the Superconducting RF Activities for the HIE ISOLDE Project
title Status of the Superconducting RF Activities for the HIE ISOLDE Project
title_full Status of the Superconducting RF Activities for the HIE ISOLDE Project
title_fullStr Status of the Superconducting RF Activities for the HIE ISOLDE Project
title_full_unstemmed Status of the Superconducting RF Activities for the HIE ISOLDE Project
title_short Status of the Superconducting RF Activities for the HIE ISOLDE Project
title_sort status of the superconducting rf activities for the hie isolde project
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1555428
work_keys_str_mv AT venturinidelsolarow statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT calatronis statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT capatinao statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT valuchd statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT therassem statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT jecklinn statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT kadiy statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT maesenp statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT fraserma statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT montesinose statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT delaupb statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT statusofthesuperconductingrfactivitiesforthehieisoldeproject
AT mondinoi statusofthesuperconductingrfactivitiesforthehieisoldeproject