Cargando…
The First Two Years of LHC Operation
The operational performance of the LHC machine both for proton and lead ion operation are reviewed for the period 2010 up to the present. The beam parameter path allowing the very high rate of collider performance is presented and discussed. The accelerator issues encountered and those somewhat...
Autor principal: | Myers, S |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1558397 |
Ejemplares similares
-
LHC Commissioning and First Operation
por: Myers, S
Publicado: (2010) -
The First Years of LHC Operation for Luminosity Production
por: Lamont, Mike
Publicado: (2013) -
Electrical Circuits Required for the Minimum Workable LHC during Commissioning and first two years of Operation
por: Giovannozzi, Massimo
Publicado: (2006) -
First two years operational experience with LEP
por: Bailey, R, et al.
Publicado: (1991) -
Beam Measurement Required in the first two years of LHC Commissioning
por: Zimmermann, Frank
Publicado: (2006)