Cargando…

CLIC Status and Outlook

The Compact Linear Collider study (CLIC) is in the process of completing a Conceptual Design Report (CDR) for a multi-TeV linear electron-positron collider. The CLICconcept is based on high gradient normal-conducting accelerating structures. The RF power for the acceleration of the colliding beams i...

Descripción completa

Detalles Bibliográficos
Autor principal: Stapnes, Stapnes
Lenguaje:eng
Publicado: 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/1558411
_version_ 1780930577505976320
author Stapnes, Stapnes
author_facet Stapnes, Stapnes
author_sort Stapnes, Stapnes
collection CERN
description The Compact Linear Collider study (CLIC) is in the process of completing a Conceptual Design Report (CDR) for a multi-TeV linear electron-positron collider. The CLICconcept is based on high gradient normal-conducting accelerating structures. The RF power for the acceleration of the colliding beams is produced by a novel two beam acceleration scheme, where power is extracted from a high current drive beam that runs parallel with the main linac. In order to establish the feasibility of this concept a number of key issues have been addressed. A short summary of the progress and status of the corresponding studies will be given, as well as an outline of the preparation and work towards an implementation plan by 2016.
id cern-1558411
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
record_format invenio
spelling cern-15584112023-07-20T15:07:17Zhttp://cds.cern.ch/record/1558411engStapnes, StapnesCLIC Status and OutlookAccelerators and Storage RingsThe Compact Linear Collider study (CLIC) is in the process of completing a Conceptual Design Report (CDR) for a multi-TeV linear electron-positron collider. The CLICconcept is based on high gradient normal-conducting accelerating structures. The RF power for the acceleration of the colliding beams is produced by a novel two beam acceleration scheme, where power is extracted from a high current drive beam that runs parallel with the main linac. In order to establish the feasibility of this concept a number of key issues have been addressed. A short summary of the progress and status of the corresponding studies will be given, as well as an outline of the preparation and work towards an implementation plan by 2016.CLIC-Note-950oai:cds.cern.ch:15584112012
spellingShingle Accelerators and Storage Rings
Stapnes, Stapnes
CLIC Status and Outlook
title CLIC Status and Outlook
title_full CLIC Status and Outlook
title_fullStr CLIC Status and Outlook
title_full_unstemmed CLIC Status and Outlook
title_short CLIC Status and Outlook
title_sort clic status and outlook
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1558411
work_keys_str_mv AT stapnesstapnes clicstatusandoutlook