Cargando…

First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit

Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the mac...

Descripción completa

Detalles Bibliográficos
Autores principales: Antoine, A, Boucly, C, Magnin, N, Juteau, P, Voumard, N
Lenguaje:eng
Publicado: 2011
Acceso en línea:http://cds.cern.ch/record/1563911
_version_ 1780930795655921664
author Antoine, A
Boucly, C
Magnin, N
Juteau, P
Voumard, N
author_facet Antoine, A
Boucly, C
Magnin, N
Juteau, P
Voumard, N
author_sort Antoine, A
collection CERN
description Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 μs beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented for a safer operation. This includes an increase of the diagnosis and monitoring functionalities and a more automated validation of the hardware and embedded firmware before deploying or executing a post-operational analysis of the TSU performance, after each dump action. In the light of this first experience the outcome of the external review performed in 2010 is presented. The lessons learnt on the project life cycle for the design of mission critical electronic modules are discussed.
id cern-1563911
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2011
record_format invenio
spelling cern-15639112022-08-17T13:32:40Zhttp://cds.cern.ch/record/1563911engAntoine, ABoucly, CMagnin, NJuteau, PVoumard, NFirst Operational Experience with the LHC Beam Dump Trigger Synchronisation UnitTwo LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 μs beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented for a safer operation. This includes an increase of the diagnosis and monitoring functionalities and a more automated validation of the hardware and embedded firmware before deploying or executing a post-operational analysis of the TSU performance, after each dump action. In the light of this first experience the outcome of the external review performed in 2010 is presented. The lessons learnt on the project life cycle for the design of mission critical electronic modules are discussed.oai:cds.cern.ch:15639112011
spellingShingle Antoine, A
Boucly, C
Magnin, N
Juteau, P
Voumard, N
First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
title First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
title_full First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
title_fullStr First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
title_full_unstemmed First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
title_short First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
title_sort first operational experience with the lhc beam dump trigger synchronisation unit
url http://cds.cern.ch/record/1563911
work_keys_str_mv AT antoinea firstoperationalexperiencewiththelhcbeamdumptriggersynchronisationunit
AT bouclyc firstoperationalexperiencewiththelhcbeamdumptriggersynchronisationunit
AT magninn firstoperationalexperiencewiththelhcbeamdumptriggersynchronisationunit
AT juteaup firstoperationalexperiencewiththelhcbeamdumptriggersynchronisationunit
AT voumardn firstoperationalexperiencewiththelhcbeamdumptriggersynchronisationunit