First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the mac...
Autores principales: | Antoine, A, Boucly, C, Magnin, N, Juteau, P, Voumard, N |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Acceso en línea: | http://cds.cern.ch/record/1563911 |
Ejemplares similares
-
The LHC Beam Dumping System Trigger Synchronisation and Distribution System
por: Antoine, A, et al.
Publicado: (2005) -
Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
por: Magnin, Nicolas, et al.
Publicado: (2015) -
LHC beam dumping system: status and readiness for LHC Run 2
por: Magnin, N, et al.
Publicado: (2014) -
Commissioning of the Control System for the LHC Beam Dump Kicker System
por: Carlier, E, et al.
Publicado: (2010) -
Reliability Analysis of the Trigger Synchronisation and Distribution System of the LHC Beam Dumping System
por: Filippini, R, et al.
Publicado: (2013)