Cargando…
Operating the LCG and EGEE Production Grids for HEP
<!--HTML-->In September 2003 the first LCG-1 service was put into production at most of the large Tier 1 sites and was quickly expanded up to 30 Tier 1 and Tier 2 sites by the end of the year. Several software upgrades were made and the LCG-2 service was put into production in time for the...
Autor principal: | Bird, I. |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1564528 |
Ejemplares similares
-
Experiences with the GLUE information schema in the LCG/EGEE production grid
por: Burke, S, et al.
Publicado: (2008) -
The impact and adoption of GLUE 2.0 in the LCG/EGEE production grid
por: Burke, Stephen, et al.
Publicado: (2010) -
LHCb experience using LCG/EGEE
por: Closier, Joël
Publicado: (2006) -
Building HEP Software with Spack: Experiences from Pilot Builds for Key4hep and Outlook for LCG Releases
por: Volkl, Valentin
Publicado: (2021) -
Distributed analysis using GANGA on the EGEE/LCG infrastructure
por: Elmsheuser, J, et al.
Publicado: (2008)