Cargando…
A new data-centre for the LHCb experiment
The upgraded LHCb experiment, which is supposed to go into operation in 2018/19 will require a massive increase in its computer facilities. A new 2 MW data-centre is planned at the LHCb site. Apart from the obvious requirement of minimizing the cost, the data-centre has to tie in well with the needs...
Autores principales: | Brarda, Lo, Jost, Beat, Lacarrere, Daniel, Lindner, Rolf, Neufeld, Niko, Roy, Laurent, Thomas, Eric |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1742-6596/396/1/012009 http://cds.cern.ch/record/1565928 |
Ejemplares similares
-
A Universal Logging System for LHCb Online
por: Nikolaidis, Fotios, et al.
Publicado: (2012) -
The LHCb High Level Trigger Infrastructure
por: Frank, Markus, et al.
Publicado: (2007) -
The LHCb configuration database
por: Abadie, Lana, et al.
Publicado: (2005) -
Embedded PCs for electronics-control in LHCb
por: Fontanelli, Flavio, et al.
Publicado: (2005) -
Data Handling and Transfer in the LHCb Experiment
por: Stoica, Radu, et al.
Publicado: (2007)