Status and Plans for the Upgrade of the LHC Injectors

The plans for preparing the LHC injectors to fulfil the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement...

Descripción completa

Detalles Bibliográficos
Autores principales: Garoby, R, Damerau, H, Gilardoni, S, Goddard, B, Hanke, K, Lombardi, A, Manglunki, D, Meddahi, M, Mikulec, B, Ponce, L, Shaposhnikova, E, Steerenberg, R, Vretenar, M
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1566636
_version_ 1780930984218198016
author Garoby, R
Damerau, H
Gilardoni, S
Goddard, B
Hanke, K
Lombardi, A
Manglunki, D
Meddahi, M
Mikulec, B
Ponce, L
Shaposhnikova, E
Steerenberg, R
Vretenar, M
author_facet Garoby, R
Damerau, H
Gilardoni, S
Goddard, B
Hanke, K
Lombardi, A
Manglunki, D
Meddahi, M
Mikulec, B
Ponce, L
Shaposhnikova, E
Steerenberg, R
Vretenar, M
author_sort Garoby, R
collection CERN
description The plans for preparing the LHC injectors to fulfil the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement and the beam characteristics achievable at injection into the collider for protons as well as for Lead ions. These achievements are described in this paper, together with the updated project planning matched to the new schedule of the LHC.
id cern-1566636
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-15666362021-10-25T15:40:25Zhttp://cds.cern.ch/record/1566636engGaroby, RDamerau, HGilardoni, SGoddard, BHanke, KLombardi, AManglunki, DMeddahi, MMikulec, BPonce, LShaposhnikova, ESteerenberg, RVretenar, MStatus and Plans for the Upgrade of the LHC InjectorsAccelerators and Storage RingsThe plans for preparing the LHC injectors to fulfil the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement and the beam characteristics achievable at injection into the collider for protons as well as for Lead ions. These achievements are described in this paper, together with the updated project planning matched to the new schedule of the LHC.CERN-ATS-2013-059oai:cds.cern.ch:15666362013-05-12
spellingShingle Accelerators and Storage Rings
Garoby, R
Damerau, H
Gilardoni, S
Goddard, B
Hanke, K
Lombardi, A
Manglunki, D
Meddahi, M
Mikulec, B
Ponce, L
Shaposhnikova, E
Steerenberg, R
Vretenar, M
Status and Plans for the Upgrade of the LHC Injectors
title Status and Plans for the Upgrade of the LHC Injectors
title_full Status and Plans for the Upgrade of the LHC Injectors
title_fullStr Status and Plans for the Upgrade of the LHC Injectors
title_full_unstemmed Status and Plans for the Upgrade of the LHC Injectors
title_short Status and Plans for the Upgrade of the LHC Injectors
title_sort status and plans for the upgrade of the lhc injectors
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1566636
work_keys_str_mv AT garobyr statusandplansfortheupgradeofthelhcinjectors
AT damerauh statusandplansfortheupgradeofthelhcinjectors
AT gilardonis statusandplansfortheupgradeofthelhcinjectors
AT goddardb statusandplansfortheupgradeofthelhcinjectors
AT hankek statusandplansfortheupgradeofthelhcinjectors
AT lombardia statusandplansfortheupgradeofthelhcinjectors
AT manglunkid statusandplansfortheupgradeofthelhcinjectors
AT meddahim statusandplansfortheupgradeofthelhcinjectors
AT mikulecb statusandplansfortheupgradeofthelhcinjectors
AT poncel statusandplansfortheupgradeofthelhcinjectors
AT shaposhnikovae statusandplansfortheupgradeofthelhcinjectors
AT steerenbergr statusandplansfortheupgradeofthelhcinjectors
AT vretenarm statusandplansfortheupgradeofthelhcinjectors