Status and Plans for the Upgrade of the LHC Injectors
The plans for preparing the LHC injectors to fulfil the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement...
Autores principales: | , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1566636 |
_version_ | 1780930984218198016 |
---|---|
author | Garoby, R Damerau, H Gilardoni, S Goddard, B Hanke, K Lombardi, A Manglunki, D Meddahi, M Mikulec, B Ponce, L Shaposhnikova, E Steerenberg, R Vretenar, M |
author_facet | Garoby, R Damerau, H Gilardoni, S Goddard, B Hanke, K Lombardi, A Manglunki, D Meddahi, M Mikulec, B Ponce, L Shaposhnikova, E Steerenberg, R Vretenar, M |
author_sort | Garoby, R |
collection | CERN |
description | The plans for preparing the LHC injectors to fulfil the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement and the beam characteristics achievable at injection into the collider for protons as well as for Lead ions. These achievements are described in this paper, together with the updated project planning matched to the new schedule of the LHC. |
id | cern-1566636 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-15666362021-10-25T15:40:25Zhttp://cds.cern.ch/record/1566636engGaroby, RDamerau, HGilardoni, SGoddard, BHanke, KLombardi, AManglunki, DMeddahi, MMikulec, BPonce, LShaposhnikova, ESteerenberg, RVretenar, MStatus and Plans for the Upgrade of the LHC InjectorsAccelerators and Storage RingsThe plans for preparing the LHC injectors to fulfil the needs of the LHC during the next decade have significantly progressed in 2012. Linac4 construction has passed major steps of pre-series fabrication. Hardware developments and beam studies have allowed refining the baseline actions to implement and the beam characteristics achievable at injection into the collider for protons as well as for Lead ions. These achievements are described in this paper, together with the updated project planning matched to the new schedule of the LHC.CERN-ATS-2013-059oai:cds.cern.ch:15666362013-05-12 |
spellingShingle | Accelerators and Storage Rings Garoby, R Damerau, H Gilardoni, S Goddard, B Hanke, K Lombardi, A Manglunki, D Meddahi, M Mikulec, B Ponce, L Shaposhnikova, E Steerenberg, R Vretenar, M Status and Plans for the Upgrade of the LHC Injectors |
title | Status and Plans for the Upgrade of the LHC Injectors |
title_full | Status and Plans for the Upgrade of the LHC Injectors |
title_fullStr | Status and Plans for the Upgrade of the LHC Injectors |
title_full_unstemmed | Status and Plans for the Upgrade of the LHC Injectors |
title_short | Status and Plans for the Upgrade of the LHC Injectors |
title_sort | status and plans for the upgrade of the lhc injectors |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1566636 |
work_keys_str_mv | AT garobyr statusandplansfortheupgradeofthelhcinjectors AT damerauh statusandplansfortheupgradeofthelhcinjectors AT gilardonis statusandplansfortheupgradeofthelhcinjectors AT goddardb statusandplansfortheupgradeofthelhcinjectors AT hankek statusandplansfortheupgradeofthelhcinjectors AT lombardia statusandplansfortheupgradeofthelhcinjectors AT manglunkid statusandplansfortheupgradeofthelhcinjectors AT meddahim statusandplansfortheupgradeofthelhcinjectors AT mikulecb statusandplansfortheupgradeofthelhcinjectors AT poncel statusandplansfortheupgradeofthelhcinjectors AT shaposhnikovae statusandplansfortheupgradeofthelhcinjectors AT steerenbergr statusandplansfortheupgradeofthelhcinjectors AT vretenarm statusandplansfortheupgradeofthelhcinjectors |