Thes - Website for Thermal Shields Upgrade Management

There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where...

Descripción completa

Detalles Bibliográficos
Autor principal: Micula, Adina
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1571036
_version_ 1780931032809209856
author Micula, Adina
author_facet Micula, Adina
author_sort Micula, Adina
collection CERN
description There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.
id cern-1571036
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-15710362019-09-30T06:29:59Zhttp://cds.cern.ch/record/1571036engMicula, AdinaThes - Website for Thermal Shields Upgrade Management EngineeringThere are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.CERN-STUDENTS-Note-2013-034oai:cds.cern.ch:15710362013-08-09
spellingShingle Engineering
Micula, Adina
Thes - Website for Thermal Shields Upgrade Management
title Thes - Website for Thermal Shields Upgrade Management
title_full Thes - Website for Thermal Shields Upgrade Management
title_fullStr Thes - Website for Thermal Shields Upgrade Management
title_full_unstemmed Thes - Website for Thermal Shields Upgrade Management
title_short Thes - Website for Thermal Shields Upgrade Management
title_sort thes - website for thermal shields upgrade management
topic Engineering
url http://cds.cern.ch/record/1571036
work_keys_str_mv AT miculaadina theswebsiteforthermalshieldsupgrademanagement