Upgrades for the CERN PSB-to-PS Transfer at 2 GeV

The CERN PS Booster extraction energy will be upgraded from 1.4 to 2.0 GeV to alleviate the direct space charge tune shift in the PS. The focussing structure of the transfer line will be modified in order to better match the optics between the PSB and the PS. The optics of the PS at injection and, w...

Descripción completa

Detalles Bibliográficos
Autores principales: Bartmann, W, Balhan, B, Borburgh, J, Cole, J, Gilardoni, S, Goddard, B, Hans, O, Hourican, M, Sermeus, L, Steerenberg, R, Yu, C
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1574602
_version_ 1780931052203671552
author Bartmann, W
Balhan, B
Borburgh, J
Cole, J
Gilardoni, S
Goddard, B
Hans, O
Hourican, M
Sermeus, L
Steerenberg, R
Yu, C
author_facet Bartmann, W
Balhan, B
Borburgh, J
Cole, J
Gilardoni, S
Goddard, B
Hans, O
Hourican, M
Sermeus, L
Steerenberg, R
Yu, C
author_sort Bartmann, W
collection CERN
description The CERN PS Booster extraction energy will be upgraded from 1.4 to 2.0 GeV to alleviate the direct space charge tune shift in the PS. The focussing structure of the transfer line will be modified in order to better match the optics between the PSB and the PS. The optics of the PS at injection and, with it, of the transfer line can be adapted to reduce the continuous losses from the already injected and circulating beam bumped towards the septum. Experimental results of the optics optimisation and probing the injection kicker flat top are shown. Modifications of the recombination septa and the main horizontal bending magnet in the measurement line are presented.
id cern-1574602
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-15746022022-08-10T20:05:54Zhttp://cds.cern.ch/record/1574602engBartmann, WBalhan, BBorburgh, JCole, JGilardoni, SGoddard, BHans, OHourican, MSermeus, LSteerenberg, RYu, CUpgrades for the CERN PSB-to-PS Transfer at 2 GeVAccelerators and Storage RingsThe CERN PS Booster extraction energy will be upgraded from 1.4 to 2.0 GeV to alleviate the direct space charge tune shift in the PS. The focussing structure of the transfer line will be modified in order to better match the optics between the PSB and the PS. The optics of the PS at injection and, with it, of the transfer line can be adapted to reduce the continuous losses from the already injected and circulating beam bumped towards the septum. Experimental results of the optics optimisation and probing the injection kicker flat top are shown. Modifications of the recombination septa and the main horizontal bending magnet in the measurement line are presented.CERN-ACC-2013-0078oai:cds.cern.ch:15746022013-07-31
spellingShingle Accelerators and Storage Rings
Bartmann, W
Balhan, B
Borburgh, J
Cole, J
Gilardoni, S
Goddard, B
Hans, O
Hourican, M
Sermeus, L
Steerenberg, R
Yu, C
Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
title Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
title_full Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
title_fullStr Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
title_full_unstemmed Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
title_short Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
title_sort upgrades for the cern psb-to-ps transfer at 2 gev
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1574602
work_keys_str_mv AT bartmannw upgradesforthecernpsbtopstransferat2gev
AT balhanb upgradesforthecernpsbtopstransferat2gev
AT borburghj upgradesforthecernpsbtopstransferat2gev
AT colej upgradesforthecernpsbtopstransferat2gev
AT gilardonis upgradesforthecernpsbtopstransferat2gev
AT goddardb upgradesforthecernpsbtopstransferat2gev
AT hanso upgradesforthecernpsbtopstransferat2gev
AT houricanm upgradesforthecernpsbtopstransferat2gev
AT sermeusl upgradesforthecernpsbtopstransferat2gev
AT steerenbergr upgradesforthecernpsbtopstransferat2gev
AT yuc upgradesforthecernpsbtopstransferat2gev