Cargando…
Upgrades for the CERN PSB-to-PS Transfer at 2 GeV
The CERN PS Booster extraction energy will be upgraded from 1.4 to 2.0 GeV to alleviate the direct space charge tune shift in the PS. The focussing structure of the transfer line will be modified in order to better match the optics between the PSB and the PS. The optics of the PS at injection and, w...
Autores principales: | Bartmann, W, Balhan, B, Borburgh, J, Cole, J, Gilardoni, S, Goddard, B, Hans, O, Hourican, M, Sermeus, L, Steerenberg, R, Yu, C |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1574602 |
Ejemplares similares
-
CERN PSB to PS Transfer Modifications for the 2 GeV Upgrade
por: Bartmann, W, et al.
Publicado: (2012) -
New PSB H$^{−}$ Injection and 2 GeV Transfer to the CERN PS
por: Bartmann, Wolfgang, et al.
Publicado: (2015) -
Feasibility Study of a CERN PS Injection at 2 GeV
por: Borburgh, J, et al.
Publicado: (2011) -
Considerations on the Fast Pulsed Magnet Systems for the 2 GeV Beam Transfer from the CERN PSB to PS
por: Kramer, Thomas, et al.
Publicado: (2015) -
Injection and Extraction Considerations for a 2 GeV RCS at CERN
por: Bartmann, W, et al.
Publicado: (2011)