Cargando…

Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility

A short baseline neutrino facility at CERN is presently under study. It is considered to extract a 100 GeV beam from the second long straight section of the SPS into the existing transfer channel TT20, which leads to the North Area experimental zone. A new transfer line would branch off the existing...

Descripción completa

Detalles Bibliográficos
Autores principales: Bartmann, W, Goddard, B, Kosmicki, A, Kowalska, M, Velotti, F
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1574606
_version_ 1780931053113835520
author Bartmann, W
Goddard, B
Kosmicki, A
Kowalska, M
Velotti, F
author_facet Bartmann, W
Goddard, B
Kosmicki, A
Kowalska, M
Velotti, F
author_sort Bartmann, W
collection CERN
description A short baseline neutrino facility at CERN is presently under study. It is considered to extract a 100 GeV beam from the second long straight section of the SPS into the existing transfer channel TT20, which leads to the North Area experimental zone. A new transfer line would branch off the existing TT20 line around 600 m downstream of the extraction, followed by an S-shaped horizontal bending arc to direct the beam with the correct angle onto the defined target location. This paper describes the optimisation of the line geometry with respect to the switch regions in TT20, the integration into the existing facilities and the potential refurbishment of existing magnets. The optics design is shown, and the requirements for the magnets, power converters and instrumentation hardware are discussed.
id cern-1574606
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-15746062022-08-10T20:05:55Zhttp://cds.cern.ch/record/1574606engBartmann, WGoddard, BKosmicki, AKowalska, MVelotti, FDesign Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino FacilityAccelerators and Storage RingsA short baseline neutrino facility at CERN is presently under study. It is considered to extract a 100 GeV beam from the second long straight section of the SPS into the existing transfer channel TT20, which leads to the North Area experimental zone. A new transfer line would branch off the existing TT20 line around 600 m downstream of the extraction, followed by an S-shaped horizontal bending arc to direct the beam with the correct angle onto the defined target location. This paper describes the optimisation of the line geometry with respect to the switch regions in TT20, the integration into the existing facilities and the potential refurbishment of existing magnets. The optics design is shown, and the requirements for the magnets, power converters and instrumentation hardware are discussed.CERN-ACC-2013-0079oai:cds.cern.ch:15746062013-07-31
spellingShingle Accelerators and Storage Rings
Bartmann, W
Goddard, B
Kosmicki, A
Kowalska, M
Velotti, F
Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
title Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
title_full Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
title_fullStr Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
title_full_unstemmed Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
title_short Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
title_sort design study of a 100 gev beam transfer line from the sps for a short baseline neutrino facility
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1574606
work_keys_str_mv AT bartmannw designstudyofa100gevbeamtransferlinefromthespsforashortbaselineneutrinofacility
AT goddardb designstudyofa100gevbeamtransferlinefromthespsforashortbaselineneutrinofacility
AT kosmickia designstudyofa100gevbeamtransferlinefromthespsforashortbaselineneutrinofacility
AT kowalskam designstudyofa100gevbeamtransferlinefromthespsforashortbaselineneutrinofacility
AT velottif designstudyofa100gevbeamtransferlinefromthespsforashortbaselineneutrinofacility