Cargando…
Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
A short baseline neutrino facility at CERN is presently under study. It is considered to extract a 100 GeV beam from the second long straight section of the SPS into the existing transfer channel TT20, which leads to the North Area experimental zone. A new transfer line would branch off the existing...
Autores principales: | Bartmann, W, Goddard, B, Kosmicki, A, Kowalska, M, Velotti, F |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1574606 |
Ejemplares similares
-
Feasibility Studies for 100 GeV Beam Transfer Lines for a CERN Neutrino Facility
por: Kowalska, Magdalena, et al.
Publicado: (2014) -
Beam Transfer Systems for the LAGUNA-LBNO Long Baseline Neutrino Beam from the CERN SPS
por: Goddard, B, et al.
Publicado: (2013) -
Non-local Fast Extraction from the CERN SPS at 100 and 440 GeV
por: Velotti, F M, et al.
Publicado: (2013) -
Update on beam transfer line design for the SPS Beam Dump Facility
por: Dutheil, Yann, et al.
Publicado: (2019) -
Beam Simulation Studies for the Upgrade of the SPS Beam Dumping System
por: Heßler, Christoph, et al.
Publicado: (2018)