Cargando…

Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility

A short baseline neutrino facility at CERN is presently under study. It is considered to extract a 100 GeV beam from the second long straight section of the SPS into the existing transfer channel TT20, which leads to the North Area experimental zone. A new transfer line would branch off the existing...

Descripción completa

Detalles Bibliográficos
Autores principales: Bartmann, W, Goddard, B, Kosmicki, A, Kowalska, M, Velotti, F
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1574606

Ejemplares similares