Cargando…

The First Long Shutdown (LS1) for the LHC

The LHC has been delivering data to the physics experiments since the first collisions in 2009. The first long shutdown (LS1), which started on 14 February 2013, was triggered by the need to consolidate the magnet interconnections to allow the LHC to operate at the design energy of 14 TeV in the cen...

Descripción completa

Detalles Bibliográficos
Autores principales: Bordry, F, Baird, S, Foraz, K, Perrot, A L, Saban, R, Tock, J Ph
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1575133
_version_ 1780931055371419648
author Bordry, F
Baird, S
Foraz, K
Perrot, A L
Saban, R
Tock, J Ph
author_facet Bordry, F
Baird, S
Foraz, K
Perrot, A L
Saban, R
Tock, J Ph
author_sort Bordry, F
collection CERN
description The LHC has been delivering data to the physics experiments since the first collisions in 2009. The first long shutdown (LS1), which started on 14 February 2013, was triggered by the need to consolidate the magnet interconnections to allow the LHC to operate at the design energy of 14 TeV in the centre-of-mass. It has now become a major shutdown, which, in addition, includes other repairs, consolidation, upgrades and cabling across the whole accelerator complex and the associated experimental facilities. A detailed CERN-wide resource-loaded schedule was prepared aiming at resuming LHC physics in early 2015, while the rest of the CERN complex will gradually start up again in the second half of 2014.\nThe paper describes the preparation phase with the prioritisation of the activities, the building of the teams and the planning of the shutdown. Then, it gives an overview of the injector activities and the main projects in the LHC. The decision to restart at 6.5 TeV after the LS1 is recalled.
id cern-1575133
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-15751332022-08-10T20:06:54Zhttp://cds.cern.ch/record/1575133engBordry, FBaird, SForaz, KPerrot, A LSaban, RTock, J PhThe First Long Shutdown (LS1) for the LHCAccelerators and Storage RingsThe LHC has been delivering data to the physics experiments since the first collisions in 2009. The first long shutdown (LS1), which started on 14 February 2013, was triggered by the need to consolidate the magnet interconnections to allow the LHC to operate at the design energy of 14 TeV in the centre-of-mass. It has now become a major shutdown, which, in addition, includes other repairs, consolidation, upgrades and cabling across the whole accelerator complex and the associated experimental facilities. A detailed CERN-wide resource-loaded schedule was prepared aiming at resuming LHC physics in early 2015, while the rest of the CERN complex will gradually start up again in the second half of 2014.\nThe paper describes the preparation phase with the prioritisation of the activities, the building of the teams and the planning of the shutdown. Then, it gives an overview of the injector activities and the main projects in the LHC. The decision to restart at 6.5 TeV after the LS1 is recalled.CERN-ACC-2013-0084oai:cds.cern.ch:15751332013-07-31
spellingShingle Accelerators and Storage Rings
Bordry, F
Baird, S
Foraz, K
Perrot, A L
Saban, R
Tock, J Ph
The First Long Shutdown (LS1) for the LHC
title The First Long Shutdown (LS1) for the LHC
title_full The First Long Shutdown (LS1) for the LHC
title_fullStr The First Long Shutdown (LS1) for the LHC
title_full_unstemmed The First Long Shutdown (LS1) for the LHC
title_short The First Long Shutdown (LS1) for the LHC
title_sort first long shutdown (ls1) for the lhc
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1575133
work_keys_str_mv AT bordryf thefirstlongshutdownls1forthelhc
AT bairds thefirstlongshutdownls1forthelhc
AT forazk thefirstlongshutdownls1forthelhc
AT perrotal thefirstlongshutdownls1forthelhc
AT sabanr thefirstlongshutdownls1forthelhc
AT tockjph thefirstlongshutdownls1forthelhc
AT bordryf firstlongshutdownls1forthelhc
AT bairds firstlongshutdownls1forthelhc
AT forazk firstlongshutdownls1forthelhc
AT perrotal firstlongshutdownls1forthelhc
AT sabanr firstlongshutdownls1forthelhc
AT tockjph firstlongshutdownls1forthelhc