Cargando…
A New Lead Ion Injection System for the CERN SPS with 50 ns Rise Time
The LHC High Luminosity upgrade project includes a performance upgrade for heavy ions. One of the present performance limitations is the rise time of the SPS injection kicker system, which imposes a spacing of at least 220 ns between injected bunch trains at the operational rigidity. A reduction of...
Autores principales: | Goddard, B, Aberle, O, Borburgh, J, Carlier, E, Cornelis, K, Ducimetière, L, Jensen, L K, Kramer, T, Manglunki, D, Mereghetti, A, Mertens, V, Nisbet, D, Salvant, B, Sermeus, L |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1576062 |
Ejemplares similares
-
SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time
por: Goddard, Brennan, et al.
Publicado: (2016) -
Upgrade of the SPS Injection Kicker System for the LHC High Luminosity Operation with Heavy Ion Beam
por: Kramer, T, et al.
Publicado: (2014) -
50 ns Backup Solution
por: Kain, V, et al.
Publicado: (2014) -
Studies of Beam Losses from Failures of SPS Beam Dump Kickers
por: Kramer, T, et al.
Publicado: (2007) -
Performance Studies of the SPS Beam Dump System for HL-LHC Beams
por: Velotti, FM, et al.
Publicado: (2014)